Differences between revisions 4 and 5
Revision 4 as of 2022-05-20 06:50:31
Size: 869
Comment:
Revision 5 as of 2022-05-20 09:22:10
Size: 1000
Comment:
Deletions are marked like this. Additions are marked like this.
Line 11: Line 11:
  * [[https://paper.dropbox.com/folder/show/AcceptanceTest-e.1gg8YzoPEhbTkrhvQwJ2zzo3dHVh5sJGieDgbm2n3h60mGqotBeE|Dropbox paper]]

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2022/5/20 13:00-

Review of IY and EY


VIS Meeting

Date: 2022/5/20 14:00-

Participants:

Summary Report

Type-A

Type-B

Type-Bp

Type-C

Electronics

Control

Schedule

See Schedule

  • Type-A: Monitoring of the evacuation in IY/EY.
  • Type-B/Bp/C:

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 5/23

  • Takahashi: 5/23-26
  • Sato: 5/23-27
  • Hirata: 5/23-27
  • Aso: 5/23-26

The week from 5/30

  • Takahashi: 5/30-6/3
  • Sato: 5/30-6/3
  • Hirata: 5/30-6/3

Next meeting

  • 2022/5/27(FRI)

KAGRA/Subgroups/VIS/VISMinutes20220520 (last edited 2022-05-20 14:31:07 by RyutaroTakahashi)