Differences between revisions 8 and 9
Revision 8 as of 2022-05-20 12:31:34
Size: 1188
Comment:
Revision 9 as of 2022-05-20 12:54:34
Size: 1213
Comment:
Deletions are marked like this. Additions are marked like this.
Line 22: Line 22:
 * Review of IY and EY.

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2022/5/20 13:00-

Review of IY and EY

Dropbox paper


VIS Meeting

Date: 2022/5/20 14:00-

Participants:

Summary Report

Type-A

  • Disassembled the footholds around the top chamber in EY.
  • Review of IY and EY.

Type-B

Type-Bp

  • Measured the transfer functions of the PR suspensions.

Type-C

  • Installed the repaired high power coil driver to the OMMT1.

Electronics

Control

Schedule

See Schedule

  • Type-A: Monitoring of the evacuation in IY/EY.
  • Type-B/Bp/C:

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 5/23

  • Takahashi: 5/23-26
  • Sato: 5/23-27
  • Hirata: 5/23-27
  • Aso: 5/23-26

The week from 5/30

  • Takahashi: 5/30-6/3
  • Sato: 5/30-6/3
  • Hirata: 5/30-6/3

Next meeting

  • 2022/5/27(FRI)

KAGRA/Subgroups/VIS/VISMinutes20220520 (last edited 2022-05-20 14:31:07 by RyutaroTakahashi)