Line 20: Line 20:
 * Type-Bp: Recovery of the alignmenet after the FC in PR3. Installation of traverser limit SW in PR2. MSB to PR3. Health check in the next week.  * Type-Bp: Recovery of the alignmenet after the FC in PR3. Installation of traverser limit SW in PR2. Installation of the MSB in PR3. Health check in the next week.

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2022/6/17 13:00-

Participants:

Post O3 Upgrade portal

Schedule

  • IX: Heater control of the laser for OpLev.

  • EX:
  • IY: Leak test. Installation of the Windshield.
  • EY: Vent in the next week.
  • Type-B: Stand-alone SM driver for SR3.
  • Type-Bp: Recovery of the alignmenet after the FC in PR3. Installation of traverser limit SW in PR2. Installation of the MSB in PR3. Health check in the next week.
  • Type-C:

Status

  • Replacement of flip cables: EXT and BF temp.
  • TM height setting: Following the cooling.
  • Oplev: Investigating the relation between laser and temperature.
  • ACC:
  • Commissioning in air:
  • Commissioning in vacuum:
  • Acceptance check:
  • PF actuator: At the in-vacuum commissioning.
  • New vacuum pumps for V-chambers: Test of the IYV pump.
  • Heater control: Pending.
  • TMS:

Discussion


VIS Meeting

Date: 2022/6/17 14:00-

Participants:

Summary Report

Type-A

Type-B

Type-Bp

Type-C

Electronics

Control

Schedule

  • Type-A: Monitoring during the vent in EY.
  • Type-B: FC to SR3/SRM. Investigation on the mirror replacement in SRM.
  • Type-Bp: Test of the traverser limit SW in PR2. Health check.
  • Type-C:

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 6/20

  • Takahashi:
  • Sato:
  • Hirata: 6/21-24

The week from 6/27

  • Takahashi: 6/27-7/1
  • Sato: 6/28-7/1
  • Hirata: 6/28-7/1

Next meeting

  • 2022/6/24(FRI)