Size: 1785
Comment:
|
Size: 2037
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 19: | Line 19: |
* Type-B: Stand-alone SM driver for SR3. * Type-Bp: Recovery of the alignmenet after the FC in PR3. Installation of traverser limit SW in PR2. Installation of the MSB in PR3. Health check in the next week. |
* Type-B: Stand-alone SM driver for SR3. FC to SR3/SRM in the next week. * Type-Bp: Recovery of the alignment after the FC in PR3. Installation of traverser limit SW in PR2. Installation of the MSB in PR3. Health check in the next week. |
Line 46: | Line 46: |
* Assembled the stand-alone SM driver. Connected it to the SF in SR3. It successfully worked. |
|
Line 49: | Line 51: |
* The shorted part of the broken geophone pre-amplifier was a tantalum capacitor of 100uF on the positive power line. |
Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2022/6/17 13:00-
Participants:
Schedule
IX: Heater control of the laser for OpLev.
- EX:
- IY: Leak test. Installation of the Windshield.
- EY: Vent in the next week.
- Type-B: Stand-alone SM driver for SR3. FC to SR3/SRM in the next week.
- Type-Bp: Recovery of the alignment after the FC in PR3. Installation of traverser limit SW in PR2. Installation of the MSB in PR3. Health check in the next week.
- Type-C:
Status
- Replacement of flip cables: EXT and BF temp.
- TM height setting: Following the cooling.
- Oplev: Investigating the relation between laser and temperature.
- ACC:
- Commissioning in air:
- Commissioning in vacuum:
- Acceptance check:
- PF actuator: At the in-vacuum commissioning.
- New vacuum pumps for V-chambers: Test of the IYV pump.
- Heater control: Pending.
- TMS:
Discussion
VIS Meeting
Date: 2022/6/17 14:00-
Participants:
Summary Report
Type-A
Type-B
- Assembled the stand-alone SM driver. Connected it to the SF in SR3. It successfully worked.
Type-Bp
Type-C
Electronics
- The shorted part of the broken geophone pre-amplifier was a tantalum capacitor of 100uF on the positive power line.
Control
Schedule
- Type-A: Monitoring during the vent in EY.
- Type-B: FC to SR3/SRM. Investigation on the mirror replacement in SRM.
- Type-Bp: Test of the traverser limit SW in PR2. Health check.
- Type-C:
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 6/20
- Takahashi:
- Sato:
- Hirata: 6/20-24
The week from 6/27
- Takahashi: 6/27-7/1
- Sato: 6/28-7/1
- Hirata: 6/28-7/1
Next meeting
- 2022/6/24(FRI)