Size: 1629
Comment:
|
← Revision 7 as of 2022-07-08 14:21:52 ⇥
Size: 2387
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 8: | Line 8: |
Date: 2022/7/8 13:00- | Date: 2022/7/8 13:00-13:30 |
Line 10: | Line 10: |
Participants: | Participants: Takahashi, Uchiyama, Yokozawa, Ushiba, Kimura, Yasui, Aso, Hirata, Akutsu, Ikeda, Sato, Miyoki, Node |
Line 18: | Line 18: |
* EY: Leak test. Repair of the GV. Offload of the GAS filters. | * EY: Leak test (Leak point was in the GV itself). Repair of the GV. Offload of the GAS filters. |
Line 29: | Line 29: |
* Commissioning in vacuum: | * Commissioning in vacuum: Keeping the X-arm. Health check in Y-arm. |
Line 31: | Line 31: |
* PF actuator: At the in-vacuum commissioning. * New vacuum pumps for V-chambers: When should we implement the ion pumps? It is better to do before cooling. |
* New vacuum pumps: When should we implement the ion pumps? It is better to do before cooling. |
Line 39: | Line 38: |
Date: 2022/7/8 14:00- | Date: 2022/7/8 14:00-14:15 |
Line 41: | Line 40: |
Participants: | Participants: Takahashi, Uchiyama, Fabian, Tanaka, Aso, Ushiba, Washimi |
Line 45: | Line 44: |
* Offloaded the GAS filters after the pump down in EY. * Replaced the cables for BF-FR, BF-TEMP, BF-GAS in EY. |
|
Line 46: | Line 48: |
* We replaced the small SRM mirror. The process went smoothly. I measured IM transfer functions yesterday, but I haven't compared with older measurements. Klog pending. * With Yokozawa-san, we checked whether the SRM and SR3 oplev beams were reaching the central regions of their respective mirrors. The beam in SR3 is a little lower than expected, but not by too much. |
|
Line 47: | Line 51: |
* Visual inspection of PRs. PR2 only has a small hexagon between the BF and the IM. |
Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2022/7/8 13:00-13:30
Participants: Takahashi, Uchiyama, Yokozawa, Ushiba, Kimura, Yasui, Aso, Hirata, Akutsu, Ikeda, Sato, Miyoki, Node
Schedule
IX: Offload of the F0. Adjustment of the OpLev for MN/PF.
EX: Adjustment of the OpLev for MN/PF.
- IY:
- EY: Leak test (Leak point was in the GV itself). Repair of the GV. Offload of the GAS filters.
- Type-B: Replacement of the mirror in SRM.
Type-Bp: Adjustment of the OpLev in PR2/PR3. Investigation of the PR2 suspension. Health check in the next week.
- Type-C: Health check of the IMMT1/2 in the next week.
Status
- Replacement of cables: EXT and BF temp.
- TM height setting:
- Oplev:
- ACC:
- Commissioning in air:
- Commissioning in vacuum: Keeping the X-arm. Health check in Y-arm.
- Acceptance check:
- New vacuum pumps: When should we implement the ion pumps? It is better to do before cooling.
- Heater control: Pending.
- TMS:
Discussion
VIS Meeting
Date: 2022/7/8 14:00-14:15
Participants: Takahashi, Uchiyama, Fabian, Tanaka, Aso, Ushiba, Washimi
Summary Report
Type-A
- Offloaded the GAS filters after the pump down in EY.
- Replaced the cables for BF-FR, BF-TEMP, BF-GAS in EY.
Type-B
- We replaced the small SRM mirror. The process went smoothly. I measured IM transfer functions yesterday, but I haven't compared with older measurements. Klog pending.
- With Yokozawa-san, we checked whether the SRM and SR3 oplev beams were reaching the central regions of their respective mirrors. The beam in SR3 is a little lower than expected, but not by too much.
Type-Bp
- Visual inspection of PRs. PR2 only has a small hexagon between the BF and the IM.
Type-C
Electronics
Control
Schedule
- Type-A:
- Type-B: Health check.
- Type-Bp: Health check.
- Type-C: Health check of IMMT1/2.
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 7/11
- Hirata: 7/12-15
The week from 7/18
- Sato:
- Hirata:
Next meeting
- 2022/7/15(FRI)