Line 8: Line 8:
Date: 2022/7/15 13:00- Date: 2022/7/15 13:00-13:40
Line 10: Line 10:
Participants: Participants: Takahashi, Kimura, Akutsu, Yokozawa, Uchiyama, Yasui, Sato, Ushiba, Miyoki, Aso, Hirata
Line 15: Line 15:
 * IX:
 * EX:
 * IY: Health check.
 * EY: Health check. Installation of the MNV oplev.
 * IX: Offload of GAS filters.
 * EX: Performance check at 80K.
 * IY: Health check and recovery.
 * EY: Health check and recovery. Installation of the MNV oplev.
Line 20: Line 20:
 * Type-Bp: Investigation of the previous data on PR2.  * Type-Bp: Investigation of the previous data on PR2. Calibration factor of BFH in PRM.
Line 26: Line 26:
 * Oplev:  * Oplev: Investigation of the glitches.
Line 29: Line 29:
 * Commissioning in vacuum: Keeping the X-arm. Health check in Y-arm.  * Commissioning in vacuum: Try to see DRAM signals.
Line 31: Line 31:
 * New vacuum pumps: Schedule on the installation of the ion pumps.  * New vacuum pumps: Installation of the ion pumps in IX/IY is scheduled on 8/4,5.
Line 44: Line 44:
 * Health check. Recovered the F2 in IY and the F1 in EY.
 * Offloaded the GAS filters in IX.

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2022/7/15 13:00-13:40

Participants: Takahashi, Kimura, Akutsu, Yokozawa, Uchiyama, Yasui, Sato, Ushiba, Miyoki, Aso, Hirata

Post O3 Upgrade portal

Schedule

  • IX: Offload of GAS filters.
  • EX: Performance check at 80K.
  • IY: Health check and recovery.
  • EY: Health check and recovery. Installation of the MNV oplev.
  • Type-B: Health check.
  • Type-Bp: Investigation of the previous data on PR2. Calibration factor of BFH in PRM.
  • Type-C: Health check of the IMMT1/2.

Status

  • Replacement of cables: EXT and BF temp.
  • TM height setting:
  • Oplev: Investigation of the glitches.
  • ACC:
  • Commissioning in air:
  • Commissioning in vacuum: Try to see DRAM signals.
  • Acceptance check: Type-Bp.
  • New vacuum pumps: Installation of the ion pumps in IX/IY is scheduled on 8/4,5.
  • Heater control: Pending.
  • TMS:

Discussion


VIS Meeting

Date: 2022/7/15 14:00-

Participants:

Summary Report

Type-A

  • Health check. Recovered the F2 in IY and the F1 in EY.
  • Offloaded the GAS filters in IX.

Type-B

Type-Bp

Type-C

Electronics

Control

Schedule

  • Type-A:
  • Type-B: Health check.
  • Type-Bp:
  • Type-C:

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 7/19

  • Sato: 7/19-22
  • Hirata: 7/19-22

The week from 7/25

  • Takahashi:
  • Sato: 7/26-29
  • Hirata: 7/26-29

Next meeting

  • 2022/7/22(FRI)