Line 34: Line 34:
   * A08_Calibration of local sensors: SF LVDT in PR2.
Line 38: Line 39:
   * A08_Calibration of local sensors: Summary.

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2022/7/22 13:00-

Participants:

Post O3 Upgrade portal

Schedule

  • IX: Investigation of the gliches.
  • EX:
  • IY:
  • EY:
  • Type-B: Health check. Replacement of the satellite amplifier.
  • Type-Bp: Calibration factor of BFH in PRM. Offload of the traverses, height adjustment, and preparation for the review in the next week.
  • Type-C: Health check of the IMMT1/2.

Status

  • Replacement of cables: EXT and BF temp.
  • TM height setting: Type-Bp
  • Oplev: Investigation of the glitches.
  • ACC:
  • Commissioning in air:
  • Commissioning in vacuum: Try to see DRAM signals.
  • Acceptance check: Type-Bp.
    • Opening the chamber (to offload of the traverse)
      • A02_Polarity Check: Measurement of the magnet polarities by the magneto meter.
      • A03_Rubbing Check: Final visual inspection.
      • A08_Calibration of local sensors: SF LVDT in PR2.
    • Others
      • A01_Cabling Check: Summary.
      • A04_Actuator Range(FR): Summary.
      • A06_Height measurement: Adjustment of the TM height. Fixing of the setpoints.
      • A09_Sensor Spectra: Summary.
      • A10_Transfer Function: Summary.
  • New vacuum pumps: Installation of the ion pumps in IX/IY is scheduled on 8/4,5.
  • Heater control: Pending.
  • TMS:

Discussion


VIS Meeting

Date: 2022/7/22 14:00-

Participants:

Summary Report

Type-A

Type-B

Type-Bp

Type-C

  • Health check of the IMMT1/2.

Electronics

Control

Schedule

  • Type-A:
  • Type-B: Health check.
  • Type-Bp: Offload of the traversers. Height adjustment. Review.
  • Type-C:

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 7/25

  • Takahashi: 7/25-29
  • Sato: 7/26-29
  • Hirata: 7/26-29

The week from 8/1

(F2F meeting: 8/1-3)

  • Takahashi:
  • Sato:
  • Hirata:

Next meeting

  • 2022/7/29(FRI)