Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2022/7/22 13:00-13:25
Participants: Takahashi, Hirata, Uchiyama, Aso, Ushiba, Yokozawa, Yasui, Ikeda, Hagiwara, Kimura
Schedule
- IX: Investigation of the glitches.
- EX: Monitoring of cooling.
- IY:
- EY:
- Type-B: Health check. Replacement of the satellite amplifier.
- Type-Bp: Calibration factor of BFH in PRM. Offload of the traverses, height adjustment, and preparation for the review in the next week.
- Type-C: Health check of the IMMT1/2.
Status
- Replacement of cables: EXT and BF temp.
- TM height setting: Type-Bp
- Oplev: Investigation of the glitches.
- ACC:
- Commissioning in air:
- Commissioning in vacuum: Try to see DRAM signals.
- Acceptance check: Type-Bp.
- Opening the chamber (to offload of the traverse)
- A02_Polarity Check: Measurement of the magnet polarities by the magnetometer.
- A03_Rubbing Check: Final visual inspection.
- A08_Calibration of local sensors: SF LVDT in PR2.
- Others
- A01_Cabling Check: Summary.
- A04_Actuator Range(FR): Summary.
- A06_Height measurement: Adjustment of the TM height. Fixing of the setpoints.
- A09_Sensor Spectra: Summary.
- A10_Transfer Function: Summary.
- Opening the chamber (to offload of the traverse)
- New vacuum pumps: Installation of the ion pumps in IX/IY is scheduled on 8/4,5.
- Heater control: Pending.
- TMS:
Discussion
VIS Meeting
Date: 2022/7/22 14:00-
Participants:
Summary Report
Type-A
Type-B
Type-Bp
Type-C
- Health check of the IMMT1/2. The calibration value was revised.
Electronics
Control
Schedule
- Type-A:
- Type-B: Health check.
- Type-Bp: Offload of the traversers. Height adjustment. Preparation for the review.
- Type-C:
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 7/25
- Takahashi: 7/25-29
- Sato: 7/26-29
- Hirata: 7/26-29
The week from 8/1
(F2F meeting: 8/1-3)
- Takahashi:
- Sato:
- Hirata:
Next meeting
- 2022/7/29(FRI)