⇤ ← Revision 1 as of 2022-08-04 20:30:52
Size: 1579
Comment:
|
Size: 1578
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 19: | Line 19: |
* Type-B: Damping of SR2/3 and BS. Replacement of main cards for LVDT driver in SR2/3. Cable check. | * Type-B: Damping of SR2/3 and BS. Replacement of main card for LVDT driver in SR2/3. Cable check. |
Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2022/8/5 14:00-
Participants:
Schedule
- IX:
- EX:
- IY:
- EY:
- Type-B: Damping of SR2/3 and BS. Replacement of main card for LVDT driver in SR2/3. Cable check.
- Type-Bp: Height check.
- Type-C:
Status
- Replacement of cables: EXT and BF temp.
- TM height setting: Type-Bp
- Oplev: Investigation of the glitches.
- ACC:
- Commissioning in air:
- Commissioning in vacuum: ALS DARM was locked.
Acceptance check: Dropbox paper
- New vacuum pumps: Installation of the ion pumps in IX/IY is scheduled on 8/4,5. Side hatch in SRM on 8/5.
- Heater control: Pending.
- TMS:
Discussion
VIS Meeting
Date: 2022/8/5 14:30-
Participants:
Summary Report
Type-A
Type-B
Type-Bp
Type-C
Electronics
Control
Schedule
- Type-A:
- Type-B: Health check.
- Type-Bp:
- Type-C:
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 8/8 (Obon week 8/11-16)
- Takahashi: 8/13-14
- Hirata: 8/8-10
The week from 8/15
- Takahashi: 8/15-17
- Hirata: 8/16-19
- Aso: 8/16-19
Next meeting
- 2022/8/19(FRI)