Size: 2232
Comment:
|
Size: 2413
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 49: | Line 49: |
* In SR2, pin 8 of the IM yaw picomotor has a connection to the ground pin inside the chamber. This is new, but not harmful because such a pin is connected to the ground in the driver. | * In SR2, pin 8 of the IM yaw picomotor has a connection to the ground pin inside the chamber. This is new, but not harmful because such a pin is connected to the ground in the driver. * The ground pin of the break-out cable is not so stable, so we were measuring higher values than before. Instead, we measured resistances by touching the vacuum chamber instead. |
Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2022/8/5 14:00-
Participants:
Schedule
- IX:
- EX:
- IY:
- EY:
- Type-B: Damping of SR2/3 and BS. Replacement of main card for LVDT driver in SR2/3. Cable check. Preparation for review in the next week.
Type-Bp: Height check. Review on 8/5.
- Type-C:
Status
- Replacement of cables: EXT and IY/EX remain.
- TM height setting: Type-Bp
- Oplev: Investigation of the glitches.
- ACC:
- Commissioning in air:
- Commissioning in vacuum: ALS DARM was locked.
Acceptance check: Dropbox paper
- New vacuum pumps: Installation of ion pumps in IX/IY on 8/4-5. Side hatch in SRM on 8/5.
- Heater control: Pending.
- TMS:
Discussion
VIS Meeting
Date: 2022/8/5 14:30-
Participants:
Summary Report
Type-A
Type-B
- Hirata-san and others replaced the master boards in the LVDT drivers in SR2 and SR3. In both cases there were reductions of the noise, especially at 10 Hz.
- Hirata-san and others also checked again the integrity of the cables in SR suspensions. There were some concerns that we checked today:
- In SR2, pin 8 of the IM yaw picomotor has a connection to the ground pin inside the chamber. This is new, but not harmful because such a pin is connected to the ground in the driver.
- The ground pin of the break-out cable is not so stable, so we were measuring higher values than before. Instead, we measured resistances by touching the vacuum chamber instead.
Type-Bp
Type-C
Electronics
Control
Schedule
- Type-A:
- Type-B: Health check. Preparation for review.
- Type-Bp:
- Type-C:
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 8/8 (Obon 8/11-16)
- Takahashi: 8/9-10
- Hirata: 8/8-10
The week from 8/15
- Takahashi: 8/14-17 (safety shift)
- Hirata: 8/16-19
- Aso: 8/16-19
Next meeting
- 2022/8/19(FRI)