Size: 1725
Comment:
|
← Revision 12 as of 2022-08-19 14:16:42 ⇥
Size: 2403
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 8: | Line 8: |
Date: 2022/8/19 13:00- | Date: 2022/8/19 13:00-13:20 |
Line 10: | Line 10: |
Participants: | Participants: Takahashi, Uchiyama, Yokozawa, Miyoki, Tomaru, Ushiba, Akutsu, Hirata, Yasui, Ikeda, Node |
Line 17: | Line 17: |
* Type-Bp: OpLev rearangement. | * Type-Bp: Oplev rearrangement in PR3. Taking 360deg pictures inside the chambers in the next week. |
Line 23: | Line 23: |
* Oplev: | * Oplev: Check of the beam pass in the next week. |
Line 26: | Line 26: |
* Commissioning in vacuum: ALS DARM was locked. | * Commissioning in vacuum: IR beam came to the AS port. |
Line 28: | Line 28: |
* New vacuum pumps: Side hatch in SRM on 8/22. | * New vacuum pumps: Side hatch in SRM on 8/23. |
Line 36: | Line 36: |
Date: 2022/8/19 14:00- | Date: 2022/8/19 14:00-14:15 |
Line 38: | Line 38: |
Participants: | Participants: Takahashi, Fabian, Tanaka, Aso |
Line 42: | Line 42: |
* Offloaded the BF GAS in IY. |
|
Line 43: | Line 45: |
* I posted plots comparing BS and SR2 TFs calculated with the Matlab rigid-body model. See [[ https://klog.icrr.u-tokyo.ac.jp/osl/?r=21813 | klog 21813]] * Review at 15:00 on 19th. |
|
Line 50: | Line 55: |
* Type-B: Height check. Rubbing check. Adjustment of F1 damper in BS/SR2. Adjustment of F0 FR in BS. | * Type-B: Height check. Rubbing check. Adjustment of F1 damper in BS/SR2. Adjustment of F0 FR in BS. Oplev check (various). |
Line 56: | Line 61: |
* How to set the F0 FR in BS? The present temperature is 23.5. Though we can use the heater on the chamber later, we should keep a margine of the cooling power. 23.2 is optimal? |
Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2022/8/19 13:00-13:20
Participants: Takahashi, Uchiyama, Yokozawa, Miyoki, Tomaru, Ushiba, Akutsu, Hirata, Yasui, Ikeda, Node
Schedule
- Type-A: Offload of BF GAS in IY.
Type-B: Polarity Check of magnets. Investigation of F1 damper. Recovery of geophone signals in SR2/SRM. Preparation for Review.
- Type-Bp: Oplev rearrangement in PR3. Taking 360deg pictures inside the chambers in the next week.
- Type-C:
Status
- Replacement of cables: EXT and IY/EX remain.
- TM height setting: Type-B in the next week.
- Oplev: Check of the beam pass in the next week.
- ACC:
- Commissioning in air:
- Commissioning in vacuum: IR beam came to the AS port.
Acceptance check: DropboxPaper
- New vacuum pumps: Side hatch in SRM on 8/23.
- Heater control: Pending.
- TMS: Replacement of pressure gauge in EX.
Discussion
VIS Meeting
Date: 2022/8/19 14:00-14:15
Participants: Takahashi, Fabian, Tanaka, Aso
Summary Report
Type-A
- Offloaded the BF GAS in IY.
Type-B
I posted plots comparing BS and SR2 TFs calculated with the Matlab rigid-body model. See klog 21813
- Review at 15:00 on 19th.
Type-Bp
Type-C
Electronics
Control
Schedule
- Type-A:
- Type-B: Height check. Rubbing check. Adjustment of F1 damper in BS/SR2. Adjustment of F0 FR in BS. Oplev check (various).
- Type-Bp:
- Type-C:
Safety
Discussion
- How to set the F0 FR in BS?
The present temperature is 23.5. Though we can use the heater on the chamber later, we should keep a margine of the cooling power. 23.2 is optimal?
Travel Plans
(Date in Kamioka)
The week from 8/22
- Takahashi: 8/22-26
- Sato: 8/22-26
- Hirata: 8/22-26
The week from 8/29
- Takahashi:
- Sato:
- Hirata:
Next meeting
- 2022/8/26(FRI)