Line 10: Line 10:
Participants: Participants: Takahashi, Uchiyama, Yokozawa, Miyoki, Tomaru, Ushiba, Akutsu, Hirata, Yasui, Ikeda, Node
Line 17: Line 17:
 * Type-Bp: Oplev rearrangement in PR3.  * Type-Bp: Oplev rearrangement in PR3. Taking 360deg pictures inside the chambers in the next week.
Line 23: Line 23:
 * Oplev:  * Oplev: Check of the beam pass in the next week.
Line 26: Line 26:
 * Commissioning in vacuum: ALS DARM was locked.  * Commissioning in vacuum: IR beam came to the AS port.
Line 28: Line 28:
 * New vacuum pumps: Side hatch in SRM on 8/22.  * New vacuum pumps: Side hatch in SRM on 8/23.

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2022/8/19 13:00-

Participants: Takahashi, Uchiyama, Yokozawa, Miyoki, Tomaru, Ushiba, Akutsu, Hirata, Yasui, Ikeda, Node

Post O3 Upgrade portal

Schedule

  • Type-A: Offload of BF GAS in IY.
  • Type-B: Polarity Check of magnets. Investigation of F1 damper. Recovery of geophone signals in SR2/SRM. Preparation for Review.

  • Type-Bp: Oplev rearrangement in PR3. Taking 360deg pictures inside the chambers in the next week.
  • Type-C:

Status

  • Replacement of cables: EXT and IY/EX remain.
  • TM height setting: Type-B in the next week.
  • Oplev: Check of the beam pass in the next week.
  • ACC:
  • Commissioning in air:
  • Commissioning in vacuum: IR beam came to the AS port.
  • Acceptance check: DropboxPaper

  • New vacuum pumps: Side hatch in SRM on 8/23.
  • Heater control: Pending.
  • TMS: Replacement of pressure gauge in EX.

Discussion


VIS Meeting

Date: 2022/8/19 14:00-

Participants:

Summary Report

Type-A

  • Offloaded the BF GAS in IY.

Type-B

Type-Bp

Type-C

Electronics

Control

Schedule

  • Type-A:
  • Type-B: Height check. Rubbing check. Adjustment of F1 damper in BS/SR2. Adjustment of F0 FR in BS.
  • Type-Bp:
  • Type-C:

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 8/22

  • Takahashi: 8/22-26
  • Sato: 8/22-26
  • Hirata: 8/22-26

The week from 8/29

  • Takahashi:
  • Sato:
  • Hirata:

Next meeting

  • 2022/8/26(FRI)

KAGRA/Subgroups/VIS/VISMinutes20220819 (last edited 2022-08-19 14:16:42 by RyutaroTakahashi)