Size: 1987
Comment:
|
Size: 1992
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 8: | Line 8: |
Date: 2022/8/19 13:00- | Date: 2022/8/19 13:00-13:20 |
Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2022/8/19 13:00-13:20
Participants: Takahashi, Uchiyama, Yokozawa, Miyoki, Tomaru, Ushiba, Akutsu, Hirata, Yasui, Ikeda, Node
Schedule
- Type-A: Offload of BF GAS in IY.
Type-B: Polarity Check of magnets. Investigation of F1 damper. Recovery of geophone signals in SR2/SRM. Preparation for Review.
- Type-Bp: Oplev rearrangement in PR3. Taking 360deg pictures inside the chambers in the next week.
- Type-C:
Status
- Replacement of cables: EXT and IY/EX remain.
- TM height setting: Type-B in the next week.
- Oplev: Check of the beam pass in the next week.
- ACC:
- Commissioning in air:
- Commissioning in vacuum: IR beam came to the AS port.
Acceptance check: DropboxPaper
- New vacuum pumps: Side hatch in SRM on 8/23.
- Heater control: Pending.
- TMS: Replacement of pressure gauge in EX.
Discussion
VIS Meeting
Date: 2022/8/19 14:00-
Participants:
Summary Report
Type-A
- Offloaded the BF GAS in IY.
Type-B
Type-Bp
Type-C
Electronics
Control
Schedule
- Type-A:
- Type-B: Height check. Rubbing check. Adjustment of F1 damper in BS/SR2. Adjustment of F0 FR in BS. Oplev check (various).
- Type-Bp:
- Type-C:
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 8/22
- Takahashi: 8/22-26
- Sato: 8/22-26
- Hirata: 8/22-26
The week from 8/29
- Takahashi:
- Sato:
- Hirata:
Next meeting
- 2022/8/26(FRI)