Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2022/9/30 13:00-

Participants:

Post O3 Upgrade portal

Schedule

  • Type-A: Offload of the BF GAS in IY. Replacement of the HPCD in EX.
  • Type-B: Windshield in BS.
  • Type-Bp: Windshield in PR2/PR3. Monitoring of the PRM in the next week.
  • Type-C: Health check of the IMMT suspensions. Recovery of the OMMT1/2/OSTM suspensions. Final check of the OMMT/OSTM suspensions in the next week.

Status

  • Replacement of cables: EXT remains.
  • TM height setting:
  • Oplev: Windshields.
  • ACC: Evaluation.
  • Commissioning in vacuum:
  • Acceptance check: DropboxPaper

  • Vacuum system: Closing of the IMMT-IFI-PRM chambers. Leak check.
  • Heater control: Pending.
  • TMS: Viewport in TMSY.

Discussion


VIS Meeting

Date: 2022/9/30 14:00-

Participants:

Summary Report

Type-A

Type-B

Type-Bp

Type-C

Electronics

Control

Schedule

  • Type-A:
  • Type-B:
  • Type-Bp: Monitoring of the PRM.
  • Type-C: Final check of the OMMT/OSTM suspensions.

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 10/3

  • Takahashi: 10/3-7
  • Hirata: 10/4-7
  • Aso: 10/3-6

The week from 10/10

  • Takahashi:
  • Sato:
  • Hirata:

Next meeting

  • 2022/10/7(FRI)