Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2022/10/7 13:00-
Participants:
Schedule
- Type-A: Test of the heater control in IY. Evaluation of the ACCs in IX.
- Type-B: Diagonalization of the IP LVDT-ACT in BS.
- Type-Bp: Monitoring of the GAS filters during the evacuation in PRM.
- Type-C: Monitoring of the IMMT suspensions during the evacuation.
Status
- Replacement of cables: EXT remains.
- TM height setting:
- Oplev:
- ACC: Evaluation.
- Commissioning in vacuum:
Acceptance check: DropboxPaper
- Vacuum system: Pump down of the IMMT-IFI-PRM chambers from 10/4. Leak check.
- Heater control: Test in IY.
- TMS: Finalization of TMSY.
Discussion
VIS Meeting
Date: 2022/10/7 14:00-
Participants:
Summary Report
Type-A
- Testing the heater control in IY. The heater around the cross tube can affect the BF/F3 GAS drift.
- Investigating the actuation noise in the ACCs in IX.
Type-B
Type-Bp
Type-C
Electronics
Control
Schedule
- Type-A:
- Type-B:
- Type-Bp:
- Type-C:
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 10/10
- Hirata: 10/12-14
The week from 10/17
- Takahashi:
- Sato:
- Hirata:
Next meeting
- 2022/10/14(FRI)