⇤ ← Revision 1 as of 2022-10-13 17:28:43
Size: 1489
Comment:
|
Size: 1508
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 61: | Line 61: |
* Sato: 10/18-21 |
Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2022/10/14 13:00-
Participants:
Schedule
- Type-A: Offload of the GAS filters in IX. Test of the heater control in IY.
- Type-B: Diagonalization of the IP in BS/SR2. Sensor correction in BS.
- Type-Bp:
- Type-C:
Status
- Replacement of cables: EXT remains.
- Oplev:
- ACC: Evaluation.
- Commissioning in vacuum: FPMI lock with low noise suspension controls.
Acceptance check: DropboxPaper
- Vacuum system: Reak test in BS. Pump down of the TMSY from 10/12.
- Heater control: Test in IY.
- TMS: Evacuation of TMSY.
Discussion
VIS Meeting
Date: 2022/10/14 14:00-
Participants:
Summary Report
Type-A
Type-B
Type-Bp
Type-C
Electronics
Control
Schedule
- Type-A: Investigation of ACCs.
- Type-B: IP control.
- Type-Bp:
- Type-C:
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 10/17
- Takahashi: 10/17-19
- Hirata:
- Sato: 10/18-21
The week from 10/24
- Takahashi:
- Hirata:
- Sato:
Next meeting
- 2022/10/21(FRI)