Zoom Meeting


CRY+VIS Interface Meeting

Date: 2022/10/14 13:00-

Participants:

Post O3 Upgrade portal

Schedule

  • Type-A: Offload of the GAS filters in IX. Test of the heater control in IY.
  • Type-B: Diagonalization of the IP in BS/SR2. Sensor correction in BS.
  • Type-Bp:
  • Type-C:

Status

  • Replacement of cables: EXT remains.
  • Oplev:
  • ACC: Evaluation.
  • Commissioning in vacuum: FPMI lock with low noise suspension controls.
  • Acceptance check: DropboxPaper

  • Vacuum system: Reak test in BS. Pump down of the TMSY from 10/12.
  • Heater control: Test in IY.
  • TMS: Evacuation of TMSY.

Discussion


VIS Meeting

Date: 2022/10/14 14:00-

Participants:

Summary Report

Type-A

Type-B

Type-Bp

Type-C

Electronics

Control

Schedule

  • Type-A: Investigation of ACCs.
  • Type-B: IP control.
  • Type-Bp:
  • Type-C:

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 10/17

  • Takahashi: 10/17-19
  • Hirata:
  • Sato: 10/18-21

The week from 10/24

  • Takahashi:
  • Hirata:
  • Sato:

Next meeting

  • 2022/10/21(FRI)