Date: 2022/10/14 13:00- Date: 2022/10/14 13:00-13:15
Line 10: Line 10:
Participants: Participants: Takahashi, Akutsu, Tomaru, Mitsuhashi, Ushiba, Uchiyama, Yokozawa, Aso, Miyoki, Hirata, Kimura, Ikeda
Line 22: Line 22:
 * Oplev:  * Oplev: Stabilization of the light source.
Line 24: Line 24:
 * Commissioning in vacuum: FPMI lock with low noise suspension controls.  * Commissioning: FPMI lock with low noise suspension controls.
Line 26: Line 26:
 * Vacuum system: Reak test in BS. Pump down of the TMSY from 10/12.  * Vacuum system: Reak test in BS was finished. Pump down of the TMSY was started on 10/12. Leak test in IMM, IFI, PRs, and TMSY in the next week.
Line 40: Line 40:
 * Offloaded the GAS filters in IX.
 * Testing the heater control in IY.
Line 44: Line 47:
 * Prototyping the geophone pre-amp.
Line 61: Line 66:
 * Sato: 10/18-21

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2022/10/14 13:00-13:15

Participants: Takahashi, Akutsu, Tomaru, Mitsuhashi, Ushiba, Uchiyama, Yokozawa, Aso, Miyoki, Hirata, Kimura, Ikeda

Post O3 Upgrade portal

Schedule

  • Type-A: Offload of the GAS filters in IX. Test of the heater control in IY.
  • Type-B: Diagonalization of the IP in BS/SR2. Sensor correction in BS.
  • Type-Bp:
  • Type-C:

Status

  • Replacement of cables: EXT remains.
  • Oplev: Stabilization of the light source.
  • ACC: Evaluation.
  • Commissioning: FPMI lock with low noise suspension controls.
  • Acceptance check: DropboxPaper

  • Vacuum system: Reak test in BS was finished. Pump down of the TMSY was started on 10/12. Leak test in IMM, IFI, PRs, and TMSY in the next week.
  • Heater control: Test in IY.
  • TMS: Evacuation of TMSY.

Discussion


VIS Meeting

Date: 2022/10/14 14:00-

Participants:

Summary Report

Type-A

  • Offloaded the GAS filters in IX.
  • Testing the heater control in IY.

Type-B

Type-Bp

Type-C

Electronics

  • Prototyping the geophone pre-amp.

Control

Schedule

  • Type-A: Investigation of ACCs.
  • Type-B: IP control.
  • Type-Bp:
  • Type-C:

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 10/17

  • Takahashi: 10/17-19
  • Hirata:
  • Sato: 10/18-21

The week from 10/24

  • Takahashi:
  • Hirata:
  • Sato:

Next meeting

  • 2022/10/21(FRI)