Differences between revisions 3 and 8 (spanning 5 versions)
Revision 3 as of 2022-10-14 10:10:48
Size: 1625
Comment:
Revision 8 as of 2022-10-14 13:55:03
Size: 2805
Comment:
Deletions are marked like this. Additions are marked like this.
Line 8: Line 8:
Date: 2022/10/14 13:00- Date: 2022/10/14 13:00-13:15
Line 10: Line 10:
Participants: Participants: Takahashi, Akutsu, Tomaru, Mitsuhashi, Ushiba, Uchiyama, Yokozawa, Aso, Miyoki, Hirata, Kimura, Ikeda
Line 22: Line 22:
 * Oplev:  * Oplev: Stabilization of the light source.
Line 24: Line 24:
 * Commissioning in vacuum: FPMI lock with low noise suspension controls.  * Commissioning: FPMI lock with low noise suspension controls.
Line 26: Line 26:
 * Vacuum system: Reak test in BS. Pump down of the TMSY from 10/12.  * Vacuum system: Reak test in BS was finished. Pump down of the TMSY was started on 10/12. Leak test in IMM, IFI, PRs, and TMSY in the next week.
Line 44: Line 44:
 * BS sensor correction implemented. It seems to be working fine. Noise budget and a deeper analysis of its performance are ongoing.
 * In BS too, tentative blending filters could be implemented and tested next week.
 * I tracked down the location of the data used for the calibration of BS geophones. I'll do the calibration again, just for our information.
 * I compared the geophone outour in SRM, SR2 and SR3. They are all similar but there are differences. I'll check again next week.
 * In SR2, I did IP LVDT and actuator diagonalization. The difficulty is that the resonance frequencies in L and T are both very close to 66 mHz. Some coupling reduced, but from Y to T, actuation coupling increased to 20% of the resonance in T. I want to revert to previous values of the diagonalization matrices.
Line 45: Line 50:
 * PRM: mechanical suspension models of TM have been uploaded on the filter banks.
 * Control filters for strong damping is ready to be tested next week
Line 75: Line 82:
 * 2022/10/21(FRI)  * 2022/10/21(FRI) 13:30

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2022/10/14 13:00-13:15

Participants: Takahashi, Akutsu, Tomaru, Mitsuhashi, Ushiba, Uchiyama, Yokozawa, Aso, Miyoki, Hirata, Kimura, Ikeda

Post O3 Upgrade portal

Schedule

  • Type-A: Offload of the GAS filters in IX. Test of the heater control in IY.
  • Type-B: Diagonalization of the IP in BS/SR2. Sensor correction in BS.
  • Type-Bp:
  • Type-C:

Status

  • Replacement of cables: EXT remains.
  • Oplev: Stabilization of the light source.
  • ACC: Evaluation.
  • Commissioning: FPMI lock with low noise suspension controls.
  • Acceptance check: DropboxPaper

  • Vacuum system: Reak test in BS was finished. Pump down of the TMSY was started on 10/12. Leak test in IMM, IFI, PRs, and TMSY in the next week.
  • Heater control: Test in IY.
  • TMS: Evacuation of TMSY.

Discussion


VIS Meeting

Date: 2022/10/14 14:00-

Participants:

Summary Report

Type-A

  • Offloaded the GAS filters in IX.
  • Testing the heater control in IY.

Type-B

  • BS sensor correction implemented. It seems to be working fine. Noise budget and a deeper analysis of its performance are ongoing.
  • In BS too, tentative blending filters could be implemented and tested next week.
  • I tracked down the location of the data used for the calibration of BS geophones. I'll do the calibration again, just for our information.
  • I compared the geophone outour in SRM, SR2 and SR3. They are all similar but there are differences. I'll check again next week.
  • In SR2, I did IP LVDT and actuator diagonalization. The difficulty is that the resonance frequencies in L and T are both very close to 66 mHz. Some coupling reduced, but from Y to T, actuation coupling increased to 20% of the resonance in T. I want to revert to previous values of the diagonalization matrices.

Type-Bp

  • PRM: mechanical suspension models of TM have been uploaded on the filter banks.
  • Control filters for strong damping is ready to be tested next week

Type-C

Electronics

  • Prototyping the geophone pre-amp.

Control

Schedule

  • Type-A: Investigation of ACCs.
  • Type-B: IP control.
  • Type-Bp:
  • Type-C:

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 10/17

  • Takahashi: 10/17-19
  • Hirata:
  • Sato: 10/18-21

The week from 10/24

  • Takahashi:
  • Hirata:
  • Sato:

Next meeting

  • 2022/10/21(FRI) 13:30

KAGRA/Subgroups/VIS/VISMinutes20221014 (last edited 2022-10-14 14:51:54 by RyutaroTakahashi)