Size: 1430
Comment:
|
Size: 1636
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 17: | Line 17: |
* Type-Bp: | * Type-Bp: Test of the strong damping in PRM. |
Line 22: | Line 22: |
* Oplev: Stabilization of the light source. | * Oplev: Windshield in IMMT2. |
Line 40: | Line 40: |
* Heater control in IY: The BF GAS had been saturated in the last week end (not monitored). The setpoint of the heater was changed from 30^{o}C to 25, and 0. The BF GAS was recovered. |
Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2022/10/21 13:00-
Participants:
Schedule
- Type-A: Test of the heater control in IY.
- Type-B: Optimization of the IP controls (Diagonalization, Calibration, Sensor correction).
- Type-Bp: Test of the strong damping in PRM.
- Type-C:
Status
- Replacement of cables: EXT remains.
- Oplev: Windshield in IMMT2.
- ACC: Repair of the geophone for spare.
- Commissioning:
Acceptance check: DropboxPaper
- Vacuum system: Leak test in IMM, IFI, PRs, and TMSY.
- Heater control: Test in IY.
- TMS:
Discussion
VIS Meeting
Date: 2022/10/14 13:30-
Participants:
Summary Report
Type-A
- Heater control in IY: The BF GAS had been saturated in the last week end (not monitored). The setpoint of the heater was changed from 30^{o}C to 25, and 0. The BF GAS was recovered.
Type-B
Type-Bp
Type-C
Electronics
Control
Schedule
- Type-A:
- Type-B: Optimization of IP controls.
- Type-Bp:
- Type-C:
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 10/24
- Hirata: 10/25-28
The week from 10/31
- Takahashi:
- Hirata:
- Sato:
Next meeting
- 2022/10/28(FRI) 13:30