Differences between revisions 1 and 4 (spanning 3 versions)
Revision 1 as of 2022-10-20 14:17:08
Size: 1430
Comment:
Revision 4 as of 2022-10-21 09:43:59
Size: 1633
Comment:
Deletions are marked like this. Additions are marked like this.
Line 17: Line 17:
 * Type-Bp:  * Type-Bp: Test of the strong damping in PRM.
Line 22: Line 22:
 * Oplev: Stabilization of the light source.  * Oplev: Windshield in IMMT2.
Line 40: Line 40:
 * Heater control in IY: The BF GAS had been saturated in the last weekend (not monitored). The setpoint of the heater was changed from 30C to 25C, and 0C. The BF GAS was recovered.

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2022/10/21 13:00-

Participants:

Post O3 Upgrade portal

Schedule

  • Type-A: Test of the heater control in IY.
  • Type-B: Optimization of the IP controls (Diagonalization, Calibration, Sensor correction).
  • Type-Bp: Test of the strong damping in PRM.
  • Type-C:

Status

  • Replacement of cables: EXT remains.
  • Oplev: Windshield in IMMT2.
  • ACC: Repair of the geophone for spare.
  • Commissioning:
  • Acceptance check: DropboxPaper

  • Vacuum system: Leak test in IMM, IFI, PRs, and TMSY.
  • Heater control: Test in IY.
  • TMS:

Discussion


VIS Meeting

Date: 2022/10/14 13:30-

Participants:

Summary Report

Type-A

  • Heater control in IY: The BF GAS had been saturated in the last weekend (not monitored). The setpoint of the heater was changed from 30C to 25C, and 0C. The BF GAS was recovered.

Type-B

Type-Bp

Type-C

Electronics

Control

Schedule

  • Type-A:
  • Type-B: Optimization of IP controls.
  • Type-Bp:
  • Type-C:

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 10/24

  • Hirata: 10/25-28

The week from 10/31

  • Takahashi:
  • Hirata:
  • Sato:

Next meeting

  • 2022/10/28(FRI) 13:30

KAGRA/Subgroups/VIS/VISMinutes20221021 (last edited 2022-10-21 13:46:52 by RyutaroTakahashi)