Size: 1346
Comment:
|
Size: 1397
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 25: | Line 25: |
* Vacuum system: Cooling problem in EXC? TMP in EYT. * Heater control: Test in IY. GAS drift was large in EX from 25th. |
* Vacuum system: Cooling problem in EXC? GV Opening in EYT on 10/31. Pump replacement in EYT on 11/4. * Heater control: Test in IY. GAS drift was large in EX from 10/25. |
Line 39: | Line 39: |
* GAS drift was large in EX from 25th. | * GAS drift was large in EX from 10/25. |
Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2022/10/28 13:00-
Participants:
Status
- Type-A:
- Type-B: Optimization of the IP controls (Blending filter, Sensor correction, Noise measurement).
- Type-Bp: Decoupling of TM/BF in PRM.
- Type-C:
Other items
- Replacement of cables: EXT remains.
- Oplev: Windshield in PRM.
- ACC:
- Commissioning:
- Vacuum system: Cooling problem in EXC? GV Opening in EYT on 10/31. Pump replacement in EYT on 11/4.
- Heater control: Test in IY. GAS drift was large in EX from 10/25.
- TMS:
Discussion
VIS Meeting
Date: 2022/10/28 13:30-
Participants:
Summary Report
Type-A
- GAS drift was large in EX from 10/25.
Type-B
Type-Bp
Type-C
Electronics
Control
Schedule
- Type-A:
- Type-B: Optimization of IP controls.
- Type-Bp:
- Type-C:
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 10/31
- Hirata: ?
The week from 11/7
- Takahashi: 11/7-10
- Aso: 11/7-10
Next meeting
- 2022/11/4(FRI) 13:30