Date: 2022/10/28 13:00- | Date: 2022/10/28 13:00-13:10 |
Line 10: | Line 10: |
Participants: | Participants: Takahashi, Uchiyama, Node, Mitsuhashi, Ushiba, Aso, Sato, Hirata, Ikeda, Yasui, Akutsu |
Line 12: | Line 12: |
[[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Upgrades/PostO3Upgrades|Post O3 Upgrade portal]] | [[https://paper.dropbox.com/folder/show/AcceptanceTest-e.1gg8YzoPEhbTkrhvQwJ2zzo3dHVh5sJGieDgbm2n3h60mGqotBeE|Acceptance check document]] |
Line 14: | Line 14: |
== Schedule == | == Status == |
Line 20: | Line 20: |
== Status == | == Other items == |
Line 24: | Line 24: |
* Commissioning: * Acceptance check: [[https://paper.dropbox.com/folder/show/AcceptanceTest-e.1gg8YzoPEhbTkrhvQwJ2zzo3dHVh5sJGieDgbm2n3h60mGqotBeE|DropboxPaper]] * Vacuum system: Cooling problem in EXC. TMP in EYT. * Heater control: Test in IY. Drift is large from 25th. |
* Commissioning: Lock of the PR cavity. * Vacuum system: Cooling problem in EXC? GV opening in EYT on 10/31. Moving of the dry pump in EYT on 11/4. * Heater control: Test in IY. GAS drift was large in EY from 10/25. |
Line 40: | Line 39: |
* GAS drift was large in EY from 10/25. |
|
Line 41: | Line 42: |
* SR3: With new geophone inter-calibration factors, Lucia implemented the inertial damping and updated Guardian. * SR2: * Lucia implemented inertial damping and upated Guardian. * Fabián wrote a Jupyter notebook based on Terrence's tutorial for blending geophone and LVDT using the methods he developed. It's still a work on progress. |
|
Line 42: | Line 48: |
* PRM: Ushiba-san did diagonalization of the BF and oplev. |
Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2022/10/28 13:00-13:10
Participants: Takahashi, Uchiyama, Node, Mitsuhashi, Ushiba, Aso, Sato, Hirata, Ikeda, Yasui, Akutsu
Status
- Type-A:
- Type-B: Optimization of the IP controls (Blending filter, Sensor correction, Noise measurement).
- Type-Bp: Decoupling of TM/BF in PRM.
- Type-C:
Other items
- Replacement of cables: EXT remains.
- Oplev: Windshield in PRM.
- ACC:
- Commissioning: Lock of the PR cavity.
- Vacuum system: Cooling problem in EXC? GV opening in EYT on 10/31. Moving of the dry pump in EYT on 11/4.
- Heater control: Test in IY. GAS drift was large in EY from 10/25.
- TMS:
Discussion
VIS Meeting
Date: 2022/10/28 13:30-
Participants:
Summary Report
Type-A
- GAS drift was large in EY from 10/25.
Type-B
- SR3: With new geophone inter-calibration factors, Lucia implemented the inertial damping and updated Guardian.
- SR2:
- Lucia implemented inertial damping and upated Guardian.
- Fabián wrote a Jupyter notebook based on Terrence's tutorial for blending geophone and LVDT using the methods he developed. It's still a work on progress.
Type-Bp
- PRM: Ushiba-san did diagonalization of the BF and oplev.
Type-C
Electronics
Control
Schedule
- Type-A:
- Type-B: Optimization of IP controls.
- Type-Bp:
- Type-C:
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 10/31
- Hirata: ?
The week from 11/7
- Takahashi: 11/7-10
- Aso: 11/7-10
Next meeting
- 2022/11/4(FRI) 13:30