Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2022/10/28 13:00-
Participants:
Schedule
- Type-A:
- Type-B: Optimization of the IP controls (Blending filter, Sensor correction, Noise measurement).
- Type-Bp: Decoupling of TM/BF in PRM.
- Type-C:
Status
- Replacement of cables: EXT remains.
- Oplev: Windshield in PRM.
- ACC:
- Commissioning:
Acceptance check: DropboxPaper
- Vacuum system: Cooling problem in EXC. TMP in EYT.
- Heater control: Test in IY. GAS drift is large in EX from 25th.
- TMS:
Discussion
VIS Meeting
Date: 2022/10/28 13:30-
Participants:
Summary Report
Type-A
Type-B
Type-Bp
Type-C
Electronics
Control
Schedule
- Type-A:
- Type-B: Optimization of IP controls.
- Type-Bp:
- Type-C:
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 10/31
- Hirata: ?
The week from 11/7
- Takahashi: 11/7-10
- Aso: 11/7-10
Next meeting
- 2022/11/4(FRI) 13:30