Differences between revisions 8 and 11 (spanning 3 versions)
Revision 8 as of 2022-10-28 09:31:31
Size: 1450
Comment:
Revision 11 as of 2022-10-28 09:37:39
Size: 1340
Comment:
Deletions are marked like this. Additions are marked like this.
Line 12: Line 12:
[[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Upgrades/PostO3Upgrades|Post O3 Upgrade portal]]  * [[https://paper.dropbox.com/folder/show/AcceptanceTest-e.1gg8YzoPEhbTkrhvQwJ2zzo3dHVh5sJGieDgbm2n3h60mGqotBeE|Acceptance check]]
Line 14: Line 14:
== Schedule == == Status ==
Line 20: Line 20:
== Status == == Other items ==
Line 25: Line 25:
 * Acceptance check: [[https://paper.dropbox.com/folder/show/AcceptanceTest-e.1gg8YzoPEhbTkrhvQwJ2zzo3dHVh5sJGieDgbm2n3h60mGqotBeE|DropboxPaper]]
 * Vacuum system: Cooling problem in EXC. TMP in EYT.
 * Vacuum system: Cooling problem in EXC? TMP in EYT.

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2022/10/28 13:00-

Participants:

Status

  • Type-A:
  • Type-B: Optimization of the IP controls (Blending filter, Sensor correction, Noise measurement).
  • Type-Bp: Decoupling of TM/BF in PRM.
  • Type-C:

Other items

  • Replacement of cables: EXT remains.
  • Oplev: Windshield in PRM.
  • ACC:
  • Commissioning:
  • Vacuum system: Cooling problem in EXC? TMP in EYT.
  • Heater control: Test in IY. GAS drift was large in EX from 25th.
  • TMS:

Discussion


VIS Meeting

Date: 2022/10/28 13:30-

Participants:

Summary Report

Type-A

  • GAS drift was large in EX from 25th.

Type-B

Type-Bp

Type-C

Electronics

Control

Schedule

  • Type-A:
  • Type-B: Optimization of IP controls.
  • Type-Bp:
  • Type-C:

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 10/31

  • Hirata: ?

The week from 11/7

  • Takahashi: 11/7-10
  • Aso: 11/7-10

Next meeting

  • 2022/11/4(FRI) 13:30

KAGRA/Subgroups/VIS/VISMinutes20221028 (last edited 2022-10-28 13:14:32 by RyutaroTakahashi)