Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2022/11/11 13:00-

Participants:

Acceptance check document

Status

  • Type-A: Sensor correction in EY, EX, IX, IY. Drift of the F0 in IY. Update of the MN Pitch control in EY.
  • Type-B: Script to calculate the sensor correction.
  • Type-Bp:
  • Type-C: Trouble and recovery of the OSTM suspension.

Other items

  • Replacement of cables: EXT remains.
  • Oplev:
  • ACC:
  • Commissioning:
  • Vacuum system: GV opening in EYT after 11/15.
  • Heater control:
  • TMS:

Discussion


VIS Meeting

Date: 2022/11/11 13:30-

Participants:

Summary Report

Type-A

  • The F0 in IY had a large drift, but it was recovered with room temperature control.

Type-B

Type-Bp

Type-C

  • During the adjustment of the OSTM suspension, two magnets (H2, H3) on the mirror dropped off. We made the in-situ gluing jig for the magnets and glued them successfully.

Electronics

Control

Schedule

  • Type-A:
  • Type-B:
  • Type-Bp:
  • Type-C: Finalization of the OMMT1/2/OSTM suspensions.

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 11/14

  • Takahashi: 11/16-18
  • Hirata: 11/15-18
  • Sato:

The week from 11/21

  • Takahashi:
  • Sato :
  • Hirata:

Next meeting

  • 2022/11/18(FRI) 13:30