Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2022/11/25 13:00-

Participants:

Acceptance check document

Status

  • Type-A: Drift of F1 in EY.
  • Type-B: Test of the vertical sensor correction.
  • Type-Bp:
  • Type-C: Monitoring during the evacuation.

Other items

  • Replacement of cables: EXT remains.
  • Oplev:
  • ACC:
  • Commissioning:
  • Vacuum system: Pump down of the OMMT-OMC chambers. GV opening in EYT has not been scheduled yet.
  • Heater control:
  • TMS:

Discussion


VIS Meeting

Date: 2022/11/25 13:30-

Participants:

Summary Report

Type-A

Type-B

Type-Bp

Type-C

Electronics

Control

Schedule

  • Type-A:
  • Type-B:
  • Type-Bp:
  • Type-C:

Safety

Discussion

* [Lucia] Blending filters

Travel Plans

(Date in Kamioka)

The week from 11/28

  • (F2F meeting: 11/30-12/1)
  • Hirata: 11/29-12/2

The week from 12/5

Next meeting

  • 2022/12/2(FRI) 13:30