Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2022/11/25 13:00-
Participants:
Status
- Type-A: Drift of F1 in EY.
- Type-B: Test of the vertical sensor correction.
- Type-Bp:
- Type-C: Monitoring during the evacuation.
Other items
- Replacement of cables: EXT remains.
- Oplev:
- ACC:
- Commissioning:
- Vacuum system: Pump down of the OMMT-OMC chambers. GV opening in EYT has not been scheduled yet.
- Heater control:
- TMS:
Discussion
VIS Meeting
Date: 2022/11/25 13:30-
Participants:
Summary Report
Type-A
Type-B
Type-Bp
Type-C
Electronics
Control
Schedule
- Type-A:
- Type-B:
- Type-Bp:
- Type-C:
Safety
Discussion
* [Lucia] Blending filters
Travel Plans
(Date in Kamioka)
The week from 11/28
- (F2F meeting: 11/30-12/1)
- Hirata: 11/29-12/2
The week from 12/5
Next meeting
- 2022/12/2(FRI) 13:30