Differences between revisions 2 and 3
Revision 2 as of 2022-11-24 16:49:06
Size: 1259
Comment:
Revision 3 as of 2022-11-25 12:37:04
Size: 1397
Comment:
Deletions are marked like this. Additions are marked like this.
Line 18: Line 18:
 * Type-C: Monitoring during the evacuation.  * Type-C: Monitoring of the OMMT1/2/OSTM suspensions during the evacuation.
Line 42: Line 42:
 * Monitored the OMMT1/2/OSTM suspensions during the pump down. All of OSEMs stay in the linear range.

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2022/11/25 13:00-

Participants:

Acceptance check document

Status

  • Type-A: Drift of F1 in EY.
  • Type-B: Test of the vertical sensor correction.
  • Type-Bp:
  • Type-C: Monitoring of the OMMT1/2/OSTM suspensions during the evacuation.

Other items

  • Replacement of cables: EXT remains.
  • Oplev:
  • ACC:
  • Commissioning:
  • Vacuum system: Pump down of the OMMT-OMC chambers. GV opening in EYT has not been scheduled yet.
  • Heater control:
  • TMS:

Discussion


VIS Meeting

Date: 2022/11/25 13:30-

Participants:

Summary Report

Type-A

Type-B

Type-Bp

Type-C

  • Monitored the OMMT1/2/OSTM suspensions during the pump down. All of OSEMs stay in the linear range.

Electronics

Control

Schedule

  • Type-A:
  • Type-B:
  • Type-Bp:
  • Type-C:

Safety

Discussion

* [Lucia] Blending filters

Travel Plans

(Date in Kamioka)

The week from 11/28

  • (F2F meeting: 11/30-12/1)
  • Hirata: 11/29-12/2

The week from 12/5

Next meeting

  • 2022/12/2(FRI) 13:30