Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2022/12/2 13:00-

Participants:

Acceptance check document

Status

  • Type-A: Offload of the BF in IY. Recovery from the large swing in IX.
  • Type-B: Implementation of the vertical sensor correction in SR2 and SR3.
  • Type-Bp:
  • Type-C: Health check of the OMMT1/2/OSTM suspensions.

Other items

  • Replacement of cables: EXT remains.
  • Oplev: Centering of the QPD for MNV in EY.
  • ACC:
  • Commissioning:
  • Vacuum system: EYT GV was opened on 11/29.
  • Heater control:
  • TMS:

Discussion


VIS Meeting

Date: 2022/12/2 13:30-

Participants:

Summary Report

Type-A

Type-B

Type-Bp

Type-C

Electronics

Control

Schedule

  • Type-A: ACC test.
  • Type-B:
  • Type-Bp:
  • Type-C:

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 12/5

  • Takahashi: 12/8-9
  • Hirata: 12/6-9

The week from 12/12

Next meeting

  • 2022/12/9(FRI) 13:30

KAGRA/Subgroups/VIS/VISMinutes20221202 (last edited 2022-12-02 14:07:23 by RyutaroTakahashi)