Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2022/12/2 13:00-
Participants:
Status
- Type-A: Offload of the BF in IY. Recovery from the large swing in IX.
- Type-B: Implementation of the vertical sensor correction in SR2 and SR3.
- Type-Bp:
- Type-C: Health check of the OMMT1/2/OSTM suspensions.
Other items
- Replacement of cables: EXT remains.
- Oplev: Centering of the QPD for MNV in EY.
- ACC:
- Commissioning:
- Vacuum system: EYT GV was opened on 11/29.
- Heater control:
- TMS:
Discussion
VIS Meeting
Date: 2022/12/2 13:30-
Participants:
Summary Report
Type-A
Type-B
Type-Bp
Type-C
Electronics
Control
Schedule
- Type-A: ACC test.
- Type-B:
- Type-Bp:
- Type-C:
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 12/5
- Takahashi: 12/8-9
- Hirata: 12/6-9
The week from 12/12
Next meeting
- 2022/12/9(FRI) 13:30