Size: 1263
Comment:
|
Size: 1793
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 8: | Line 8: |
Date: 2022/12/16 13:00- | Date: 2022/12/16 13:00-13:25 |
Line 10: | Line 10: |
Participants: | Participants: Takahashi, Sato, Ikeda, Hirata, Mitsuhashi, Yokozawa, Ushiba, Uchiyama, Akutsu, Kimura, Node |
Line 15: | Line 15: |
* Type-A: Update of the pitsh control for ITMX. Evaluation of the ACCs in IX/IY. Investigation of the microseismic motion in IXV. | * Type-A: Update of the pitch control for ITMX. Evaluation of the ACCs in IX/IY. Investigation of the microseismic motion in IXV. |
Line 25: | Line 25: |
* Vacuum system: GVs were opend around IXC on 12/12. | * Vacuum system: GVs were opened around IXC on 12/12. Cooler was rebooted in IXC, IYV TMP was recovered. |
Line 28: | Line 28: |
* POP, POS: Recabling around the clean booth. | |
Line 33: | Line 34: |
Date: 2022/12/16 13:30- | Date: 2022/12/16 13:30-14:05 |
Line 35: | Line 36: |
Participants: | Participants: Takahashi, Fabian, Ushiba, Uchiyama, Aso, Tanaka |
Line 39: | Line 40: |
* Evaluated the ACCs in IX and IY. The sensitivities were improved except for the IX H2. To confirm the sensitivity limit, it is necessary to control the IPs by the ACCs. |
|
Line 47: | Line 50: |
* Type-A: * Type-B: |
* Type-A: Replacement of the flip cables in EXT. Investigation of the ACCs. * Type-B: Optimization of the sensor corrections. |
Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2022/12/16 13:00-13:25
Participants: Takahashi, Sato, Ikeda, Hirata, Mitsuhashi, Yokozawa, Ushiba, Uchiyama, Akutsu, Kimura, Node
Status
- Type-A: Update of the pitch control for ITMX. Evaluation of the ACCs in IX/IY. Investigation of the microseismic motion in IXV.
- Type-B:
- Type-Bp:
- Type-C: Update of the RT model for OMC.
Other items
- Replacement of cables: 12/20or21 for EXT.
- Oplev:
- ACC: Evaluation in IX/IY.
- Commissioning:
- Vacuum system: GVs were opened around IXC on 12/12. Cooler was rebooted in IXC, IYV TMP was recovered.
- Heater control:
- TMS:
- POP, POS: Recabling around the clean booth.
Discussion
VIS Meeting
Date: 2022/12/16 13:30-14:05
Participants: Takahashi, Fabian, Ushiba, Uchiyama, Aso, Tanaka
Summary Report
Type-A
- Evaluated the ACCs in IX and IY. The sensitivities were improved except for the IX H2. To confirm the sensitivity limit, it is necessary to control the IPs by the ACCs.
Type-B
Type-Bp
Type-C
Electronics
Control
Schedule
- Type-A: Replacement of the flip cables in EXT. Investigation of the ACCs.
- Type-B: Optimization of the sensor corrections.
- Type-Bp:
- Type-C:
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 12/19
- Takahashi: 12/20-21
- Hirata: 12/20-23
The week from 12/26
Next meeting
- 2022/12/23(FRI) 13:30