Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2022/12/23 13:00-

Participants:

Acceptance check document

Status

  • Type-A:
  • Type-B: Measurement of the suspended breadboard in SR2.
  • Type-Bp: Measurement of the suspended breadboard in PR2. Inter-calibration of SF/BF in PR2/PRM.
  • Type-C:

Other items

  • Replacement of cables: 12/20 in EXT.
  • Oplev:
  • ACC: Evaluation in IX/IY.
  • Commissioning:
  • Vacuum system:
  • Heater control:
  • TMS:

Discussion


VIS Meeting

Date: 2022/12/23 13:30

Participants:

Summary Report

Type-A

  • Replaced the flip cables in EXT. Pin #3 for H2 LVDT was grounded.

Type-B

Type-Bp

Type-C

Electronics

Control

Schedule

  • Type-A: Investigation of the ACCs.
  • Type-B:
  • Type-Bp:
  • Type-C:

Safety

Discussion

  • Task list for the authorship 2023.

Travel Plans

(Date in Kamioka)

The week from 12/26

  • Hirata: 12/27-28

Next meeting

  • 2023/1/6(FRI) 13:30-