Differences between revisions 6 and 8 (spanning 2 versions)
Revision 6 as of 2022-12-23 13:18:04
Size: 1757
Comment:
Revision 8 as of 2022-12-23 14:08:55
Size: 1890
Comment:
Deletions are marked like this. Additions are marked like this.
Line 25: Line 25:
 * Vacuum system:  * Vacuum system: Cooling in IXC again, Implementation of the Q-mass in IYC.
Line 35: Line 35:
Participants: Participants: Takahashi, Uchiyama, Ushiba, Fabian, Mitsuhashi, Tanaka, Miyoki
Line 52: Line 52:
 * Type-A: Investigation of the ACCs.
 * Type-B:
 * Type-
Bp:
 * Type-A: Investigation of ACCs.
 * Type-B/Bp: Vertical sensor correction.

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2022/12/23 13:00-

Participants: Takahashi, Uchiyama, Ikeda, Ushiba, Yasui, Sato, Miyoki, Kimura, Yokozawa

Acceptance check document

Status

  • Type-A:
  • Type-B: Measurement of the suspended breadboard in SR2.
  • Type-Bp: Measurement of the suspended breadboard in PR2. Inter-calibration of SF/BF in PR2/PRM.
  • Type-C:

Other items

  • Replacement of cables: 12/20 in EXT.
  • Oplev:
  • ACC: Evaluation in IX/IY.
  • Commissioning:
  • Vacuum system: Cooling in IXC again, Implementation of the Q-mass in IYC.
  • Heater control:
  • TMS:

Discussion


VIS Meeting

Date: 2022/12/23 13:30-

Participants: Takahashi, Uchiyama, Ushiba, Fabian, Mitsuhashi, Tanaka, Miyoki

Summary Report

Type-A

  • Replaced the flip cables in EXT. Pin #3 for H2 LVDT was grounded.
  • Investigating the sensitivities of the accelerometers in IX/IY.

Type-B

  • I've been working in the optimization of the sensor correction filter for F0 LVDT. I'm nor finished, and I'll report in a future meeting

Type-Bp

  • For PR2 and PRM SF and BF, I measured transfer functions with different amounts of actuation. The frequency of the resonant peaks changes with the amplitude of the actuation.

Type-C

Electronics

Control

Schedule

  • Type-A: Investigation of ACCs.
  • Type-B/Bp: Vertical sensor correction.
  • Type-C:

Safety

Discussion

  • Task list for the authorship 2023.

Travel Plans

(Date in Kamioka)

The week from 12/26

  • Hirata: 12/27-28

Next meeting

  • 2023/1/6(FRI) 13:30-