Differences between revisions 1 and 7 (spanning 6 versions)
Revision 1 as of 2023-01-20 08:48:40
Size: 1197
Comment:
Revision 7 as of 2023-01-20 13:41:57
Size: 2052
Comment:
Deletions are marked like this. Additions are marked like this.
Line 8: Line 8:
Date: 2023/1/20 13:00- Date: 2023/1/20 13:00-13:10
Line 10: Line 10:
Participants: Participants: Takahashi, Mitsuhashi, Ikeda, Akutsu, Aso, Sato, Ushiba, Hirata
Line 24: Line 24:
 * Vacuum system:  * Vacuum system:  Boot of ISPs in the arm ducts.
Line 32: Line 32:
Date: 2023/1/20 13:30- Date: 2023/1/20 13:30-13:40
Line 34: Line 34:
Participants: Participants: Takahashi, Fabian, Mitsuhashi, Tanaka, Aso
Line 38: Line 38:
 * Implementation of the IP control with ACCs in IY.
  * Adjusted the conditioning filters and made a sensing matrix to Euler direction (L, T, Y) for the ACC signals. We confirmed the signals of geophones and ACCs are consistent.
Line 39: Line 42:
 * I calculated the expected performance of the sensor correction fitter, designed for SR3 F0 LVDT, in the BS. The performance is similar, although not as good because the LVDT has a lower sensitivity. Details are in the klog.
 * Copied the filter into the BS, SR2 and PR3 filter banks, taking into account their respective intercalibration factors.
Line 46: Line 52:
 * Type-B/Bp: Vertical sensor correction.  * Type-B/Bp: F0 sensor correction characterization. This means, free-swing amplitude spectral density measurements and consistency comparison with expectations.

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2023/1/20 13:00-13:10

Participants: Takahashi, Mitsuhashi, Ikeda, Akutsu, Aso, Sato, Ushiba, Hirata

Acceptance check document

Status

  • Type-A: Test of IP control with ACCs in IY.
  • Type-B: SF sensor correction in BS/SR2. Repair of the windshield for Oplev in SR2.
  • Type-Bp: SF sensor correction in PR3.
  • Type-C:

Other items

  • Oplev: Windshield was repaired in SR2.
  • ACC: IP control in IY.
  • Commissioning:
  • Vacuum system: Boot of ISPs in the arm ducts.
  • Heater control: Adjustment in IY.
  • TMS:

Discussion


VIS Meeting

Date: 2023/1/20 13:30-13:40

Participants: Takahashi, Fabian, Mitsuhashi, Tanaka, Aso

Summary Report

Type-A

  • Implementation of the IP control with ACCs in IY.
    • Adjusted the conditioning filters and made a sensing matrix to Euler direction (L, T, Y) for the ACC signals. We confirmed the signals of geophones and ACCs are consistent.

Type-B

  • I calculated the expected performance of the sensor correction fitter, designed for SR3 F0 LVDT, in the BS. The performance is similar, although not as good because the LVDT has a lower sensitivity. Details are in the klog.
  • Copied the filter into the BS, SR2 and PR3 filter banks, taking into account their respective intercalibration factors.

Type-Bp

Type-C

Electronics

Control

Schedule

  • Type-A: IP control with ACCs.
  • Type-B/Bp: F0 sensor correction characterization. This means, free-swing amplitude spectral density measurements and consistency comparison with expectations.
  • Type-C:

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 1/23

  • Aso: 1/23-26

Next meeting

  • 2023/1/27(FRI) 13:30-

KAGRA/Subgroups/VIS/VISMinutes20230120 (last edited 2023-01-20 13:41:57 by RyutaroTakahashi)