Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2023/1/20 13:00-

Participants:

Acceptance check document

Status

  • Type-A: Test of IP control with ACCs in IY.
  • Type-B: SF sensor correction in BS/SR2. Repair of the windshield for Oplev in SR2.
  • Type-Bp: SF sensor correction in PR3.
  • Type-C:

Other items

  • Oplev: Windshield was repaired in SR2.
  • ACC: IP control in IY.
  • Commissioning:
  • Vacuum system: Boot of ISPs in the arm ducts.
  • Heater control: Adjustment in IY.
  • TMS:

Discussion


VIS Meeting

Date: 2023/1/20 13:30-

Participants:

Summary Report

Type-A

  • Implementation of the IP control with ACCs in IY.
    • Adjusted the conditioning filters and made a sensing matrix to Euler direction (L, T, Y) for the ACC signals. We confirmed the signals of geophones and ACCs are consistent.

Type-B

Type-Bp

Type-C

Electronics

Control

Schedule

  • Type-A: IP control with ACCs.
  • Type-B/Bp: Vertical sensor correction.
  • Type-C:

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 1/23

  • Aso: 1/23-26

Next meeting

  • 2023/1/27(FRI) 13:30-