Size: 1233
Comment:
|
Size: 1276
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 49: | Line 49: |
* Type-C: | * Type-C: Monitoring of the OMMT1/2/OSTM suspensions. |
Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2023/1/27 13:00-
Participants:
Status
- Type-A: Test of IP control with ACCs in IX. Offload of F0 in IY
- Type-B:
- Type-Bp: TF measurement of BF.
- Type-C: Monitoring of the OMMT1/2/OSTM suspensions in 1/30-2/1.
Other items
- Oplev:
- ACC: IP control in IX.
- Commissioning:
- Vacuum system: Investigation of broken ISPs. Vent of the OMC chamber on 1/30.
- Heater control: Adjustment in IY.
- TMS:
Discussion
VIS Meeting
Date: 2023/1/20 13:30-
Participants:
Summary Report
Type-A
- Tested the IP control using accelerometers in IX.
Type-B
Type-Bp
Type-C
Electronics
Control
Schedule
- Type-A: IP control with ACCs.
- Type-B/Bp:
- Type-C: Monitoring of the OMMT1/2/OSTM suspensions.
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 1/30
Next meeting
- 2023/2/3(FRI) 13:30-