Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2023/2/3 13:00-

Participants:

Acceptance check document

Status

  • Type-A: Preparation of IP control with ACCs in EX/EY. Offload of F0 in IY
  • Type-B:
  • Type-Bp: Sensor correction for the BF Damper in PRM.
  • Type-C: Monitoring of the OMMT1/2/OSTM suspensions.

Other items

  • Oplev:
  • ACC: IP control in EX/EY.
  • Commissioning:
  • Vacuum system: Vent and evacuation of the OMT-OMC chamber.
  • Heater control:
  • TMS:

Discussion


VIS Meeting

Date: 2023/2/3 13:30-

Participants:

Summary Report

Type-A

  • Preparation of IP control with ACCs in EX/EY.

Type-B

Type-Bp

Type-C

  • Monitored the OMMT1/2/OSTM suspensions during the vent and the pump-down.

Electronics

Control

Schedule

  • Type-A: IP control with ACCs.
  • Type-B/Bp: Sensor correction.
  • Type-C:

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 2/6

The week from 2/13

  • Takahashi: 2/15-17

Next meeting

  • 2023/2/10(FRI) 13:30-