Line 8: Line 8:
Date: 2023/2/3 13:00- Date: 2023/2/3 13:00-13:20
Line 10: Line 10:
Participants: Participants: Takahashi, Yokozawa, Sato, Kimura, Yasui, Mitsuhashi, Ikeda, Uchiyama, Akutsu, Ushiba, Hirata, Aso, Miyoki, Node
Line 21: Line 21:
 * Oplev:  * Oplev: Checking the inventory.
Line 24: Line 24:
 * Vacuum system: Vent and evacuation of the OMT-OMC chamber.  * Vacuum system: Vent and evacuation of the OMT-OMC chamber. No leak was found. GV will be opened early next week.
Line 32: Line 32:
Date: 2023/2/3 13:30- Date: 2023/2/3 13:30-13:45
Line 34: Line 34:
Participants: Participants: Takahashi, Mitsuhashi, Sato, Hirata, Ushiba, Uchiyama, Aso, Tanaka
Line 55: Line 55:
 * Budget plan for FY2023.
  * Spare geophones.
  * Actuators for ACC.
  * BF damper for Type-B.
  * Vertical geophones for Type-Bp.
Line 60: Line 65:
 * Hirata: 2/8-10
Line 63: Line 69:
 * Mitsuhashi: 2/15-17

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2023/2/3 13:00-13:20

Participants: Takahashi, Yokozawa, Sato, Kimura, Yasui, Mitsuhashi, Ikeda, Uchiyama, Akutsu, Ushiba, Hirata, Aso, Miyoki, Node

Acceptance check document

Status

  • Type-A: Preparation of IP control with ACCs in EX/EY. Offload of F0 in IY
  • Type-B:
  • Type-Bp: Sensor correction for the BF Damper in PRM.
  • Type-C: Monitoring of the OMMT1/2/OSTM suspensions.

Other items

  • Oplev: Checking the inventory.
  • ACC: IP control in EX/EY.
  • Commissioning:
  • Vacuum system: Vent and evacuation of the OMT-OMC chamber. No leak was found. GV will be opened early next week.
  • Heater control:
  • TMS:

Discussion


VIS Meeting

Date: 2023/2/3 13:30-13:45

Participants: Takahashi, Mitsuhashi, Sato, Hirata, Ushiba, Uchiyama, Aso, Tanaka

Summary Report

Type-A

  • Preparation of IP control with ACCs in EX/EY.

Type-B

Type-Bp

Type-C

  • Monitored the OMMT1/2/OSTM suspensions during the vent and the pump-down.

Electronics

Control

Schedule

  • Type-A: IP control with ACCs.
  • Type-B/Bp: Sensor correction.
  • Type-C:

Safety

Discussion

  • Budget plan for FY2023.
    • Spare geophones.
    • Actuators for ACC.
    • BF damper for Type-B.
    • Vertical geophones for Type-Bp.

Travel Plans

(Date in Kamioka)

The week from 2/6

  • Hirata: 2/8-10

The week from 2/13

  • Takahashi: 2/15-17
  • Mitsuhashi: 2/15-17

Next meeting

  • 2023/2/10(FRI) 13:30-

KAGRA/Subgroups/VIS/VISMinutes20230203 (last edited 2023-02-03 14:36:08 by RyutaroTakahashi)