⇤ ← Revision 1 as of 2023-02-23 13:25:54
1103
Comment:
|
1130
|
Deletions are marked like this. | Additions are marked like this. |
Line 27: | Line 27: |
* Stray beam around OMC: |
Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2023/2/24 13:00-
Participants:
Status
- Type-A: LVDT trouble in IY.
- Type-B:
- Type-Bp:
- Type-C:
Other items
- Oplev:
- ACC:
- Commissioning:
- Vacuum system: Switched from the TMPs to the ISPs.
- Heater control: Adjustment in IY.
- TMS: Covering in TMSY on 2-3 March.
- Stray beam around OMC:
Discussion
VIS Meeting
Date: 2023/2/24 13:30-
Participants:
Summary Report
Type-A
Type-B
Type-Bp
Type-C
Electronics
Control
Schedule
- Type-A: IP control with ACCs.
- Type-B/Bp: Sensor correction for PR3 and PR2.
- Type-C:
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 2/27
- Aso: 2/27-28
Next meeting
- 2023/3/3(FRI) 13:30-