Differences between revisions 1 and 2
Revision 1 as of 2023-02-23 13:25:54
Size: 1103
Comment:
Revision 2 as of 2023-02-24 09:45:10
Size: 1130
Comment:
Deletions are marked like this. Additions are marked like this.
Line 27: Line 27:
 * Stray beam around OMC:

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2023/2/24 13:00-

Participants:

Acceptance check document

Status

  • Type-A: LVDT trouble in IY.
  • Type-B:
  • Type-Bp:
  • Type-C:

Other items

  • Oplev:
  • ACC:
  • Commissioning:
  • Vacuum system: Switched from the TMPs to the ISPs.
  • Heater control: Adjustment in IY.
  • TMS: Covering in TMSY on 2-3 March.
  • Stray beam around OMC:

Discussion


VIS Meeting

Date: 2023/2/24 13:30-

Participants:

Summary Report

Type-A

Type-B

Type-Bp

Type-C

Electronics

Control

Schedule

  • Type-A: IP control with ACCs.
  • Type-B/Bp: Sensor correction for PR3 and PR2.
  • Type-C:

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 2/27

  • Aso: 2/27-28

Next meeting

  • 2023/3/3(FRI) 13:30-

KAGRA/Subgroups/VIS/VISMinutes20230224 (last edited 2023-02-24 13:53:34 by RyutaroTakahashi)