Size: 1381
Comment:
|
Size: 2103
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 8: | Line 8: |
Date: 2023/3/3 13:00- | Date: 2023/3/3 13:00-13:10 |
Line 10: | Line 10: |
Participants: | Participants: Takahashi, Mitsuhashi, Hirata, Uchiyama, Sato, Tomaru, Akutsu, Aso, Kimura, Yasui, Ushiba, Yokozawa |
Line 17: | Line 17: |
* Type-Bp: Inter-calibration for the BF damper in PR3. | * Type-Bp: Inter-calibration for the BF damper in PR3. Monitoring of PRM during the vent. |
Line 21: | Line 21: |
* Oplev: | * Oplev: Investigating the glitches. |
Line 24: | Line 24: |
* Vacuum system: Switching from the TMPs to the SIPs. | * Vacuum system: SIP cable problem was due to the high humidity. The power should not be turned off. |
Line 32: | Line 32: |
Date: 2023/3/3 13:30- | Date: 2023/3/3 13:30-13:37 |
Line 34: | Line 34: |
Participants: | Participants: Takahashi, Ushiba, Uchiyama, Mitsuhashi, Aso, Fabian, Tanaka |
Line 38: | Line 38: |
* Replaced the SG board for the LVDT drivers with a new board. The oscillator signal became stable. The old board seems to have a break in the circuit. | * Replaced the SG board for the LVDT drivers with a new board in IY. The oscillator signal became stable. The old board seems to have a break in the circuit. |
Line 41: | Line 41: |
* For the BS, Terrence and I have been calculating the IP-L sensor correction and blending filters. Terrence had new ideas for updating the calculation of the filters, and it was worth trying. I aim to test the results next week. | |
Line 42: | Line 43: |
* For PR3, I added the inter-calibration factor and the BF Damper sensor correction filter. The sensor correction is enabled when the suspension goes through ENGAGE_STRONGDAMP state. |
|
Line 48: | Line 52: |
* Type-B/Bp: Sensor correction. | * Type-B/Bp: BS sensor correction and blending. |
Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2023/3/3 13:00-13:10
Participants: Takahashi, Mitsuhashi, Hirata, Uchiyama, Sato, Tomaru, Akutsu, Aso, Kimura, Yasui, Ushiba, Yokozawa
Status
- Type-A: Replacement of the SG board for the LVDTs in IY. Offload of the BF GAS in IY.
- Type-B:
- Type-Bp: Inter-calibration for the BF damper in PR3. Monitoring of PRM during the vent.
- Type-C:
Other items
- Oplev: Investigating the glitches.
- ACC:
- Commissioning:
- Vacuum system: SIP cable problem was due to the high humidity. The power should not be turned off.
- Heater control: Adjustment in IY.
- TMS: Covering in TMSY on 2-3 March.
Discussion
VIS Meeting
Date: 2023/3/3 13:30-13:37
Participants: Takahashi, Ushiba, Uchiyama, Mitsuhashi, Aso, Fabian, Tanaka
Summary Report
Type-A
- Replaced the SG board for the LVDT drivers with a new board in IY. The oscillator signal became stable. The old board seems to have a break in the circuit.
Type-B
- For the BS, Terrence and I have been calculating the IP-L sensor correction and blending filters. Terrence had new ideas for updating the calculation of the filters, and it was worth trying. I aim to test the results next week.
Type-Bp
- For PR3, I added the inter-calibration factor and the BF Damper sensor correction filter. The sensor correction is enabled when the suspension goes through ENGAGE_STRONGDAMP state.
Type-C
Electronics
Control
Schedule
- Type-A: IP control with ACCs.
- Type-B/Bp: BS sensor correction and blending.
- Type-C:
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 3/6
The week from 3/13
- Aso: 3/13-14
- Sato: 3/15-16
Next meeting
- 2023/3/10(FRI) 13:30-