Size: 1381
Comment:
|
Size: 1577
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 38: | Line 38: |
* Replaced the SG board for the LVDT drivers with a new board. The oscillator signal became stable. The old board seems to have a break in the circuit. | * Replaced the SG board for the LVDT drivers with a new board in IY. The oscillator signal became stable. The old board seems to have a break in the circuit. |
Line 42: | Line 42: |
* For PR3, I added the inter-calibration factor and the BF Damper sensor correction filter. The sensor correction is enabled when the suspension goes through ENGAGE_STRONGDAMP state. |
Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2023/3/3 13:00-
Participants:
Status
- Type-A: Replacement of the SG board for the LVDTs in IY. Offload of the BF GAS in IY.
- Type-B:
- Type-Bp: Inter-calibration for the BF damper in PR3.
- Type-C:
Other items
- Oplev:
- ACC:
- Commissioning:
- Vacuum system: Switching from the TMPs to the SIPs.
- Heater control: Adjustment in IY.
- TMS: Covering in TMSY on 2-3 March.
Discussion
VIS Meeting
Date: 2023/3/3 13:30-
Participants:
Summary Report
Type-A
- Replaced the SG board for the LVDT drivers with a new board in IY. The oscillator signal became stable. The old board seems to have a break in the circuit.
Type-B
Type-Bp
- For PR3, I added the inter-calibration factor and the BF Damper sensor correction filter. The sensor correction is enabled when the suspension goes through ENGAGE_STRONGDAMP state.
Type-C
Electronics
Control
Schedule
- Type-A: IP control with ACCs.
- Type-B/Bp: Sensor correction.
- Type-C:
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 3/6
The week from 3/13
- Aso: 3/13-14
- Sato: 3/15-16
Next meeting
- 2023/3/10(FRI) 13:30-