Differences between revisions 3 and 8 (spanning 5 versions)
Revision 3 as of 2023-03-03 10:36:05
Size: 1381
Comment:
Revision 8 as of 2023-03-03 11:13:59
Size: 1825
Comment:
Deletions are marked like this. Additions are marked like this.
Line 38: Line 38:
 * Replaced the SG board for the LVDT drivers with a new board. The oscillator signal became stable. The old board seems to have a break in the circuit.  * Replaced the SG board for the LVDT drivers with a new board in IY. The oscillator signal became stable. The old board seems to have a break in the circuit.
Line 41: Line 41:
 * For the BS, Terrence and I have been calculating the IP-L sensor correction and blending filters. Terrence had new ideas for updating the calculation of the filters, and it was worth trying. I aim to test the results next week.
Line 42: Line 43:

 * For PR3, I added the inter-calibration factor and the BF Damper sensor correction filter. The sensor correction is enabled when the suspension goes through ENGAGE_STRONGDAMP state.
Line 48: Line 52:
 * Type-B/Bp: Sensor correction.  * Type-B/Bp: BS sensor correction and blending.

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2023/3/3 13:00-

Participants:

Acceptance check document

Status

  • Type-A: Replacement of the SG board for the LVDTs in IY. Offload of the BF GAS in IY.
  • Type-B:
  • Type-Bp: Inter-calibration for the BF damper in PR3.
  • Type-C:

Other items

  • Oplev:
  • ACC:
  • Commissioning:
  • Vacuum system: Switching from the TMPs to the SIPs.
  • Heater control: Adjustment in IY.
  • TMS: Covering in TMSY on 2-3 March.

Discussion


VIS Meeting

Date: 2023/3/3 13:30-

Participants:

Summary Report

Type-A

  • Replaced the SG board for the LVDT drivers with a new board in IY. The oscillator signal became stable. The old board seems to have a break in the circuit.

Type-B

  • For the BS, Terrence and I have been calculating the IP-L sensor correction and blending filters. Terrence had new ideas for updating the calculation of the filters, and it was worth trying. I aim to test the results next week.

Type-Bp

  • For PR3, I added the inter-calibration factor and the BF Damper sensor correction filter. The sensor correction is enabled when the suspension goes through ENGAGE_STRONGDAMP state.

Type-C

Electronics

Control

Schedule

  • Type-A: IP control with ACCs.
  • Type-B/Bp: BS sensor correction and blending.
  • Type-C:

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 3/6

The week from 3/13

  • Aso: 3/13-14
  • Sato: 3/15-16

Next meeting

  • 2023/3/10(FRI) 13:30-