<> = Agenda/Minutes = [[https://zoom.us/j/203743987|Zoom Meeting]] ---------- = CRY+VIS Interface Meeting = Date: 2023/3/10 13:00-13:10 Participants: Takahashi, Kimura, Ikeda, Yokozawa, Miyoki, Sato, Aso, Hirata, Ushiba, Akutsu, Tomaru [[https://paper.dropbox.com/folder/show/AcceptanceTest-e.1gg8YzoPEhbTkrhvQwJ2zzo3dHVh5sJGieDgbm2n3h60mGqotBeE|Acceptance check document]] == Status == * Type-A: Offload of the F0 GAS in IY. DAC noise in ITMX. * Type-B: * Type-Bp: Monitoring of PRM during the evacuation. * Type-C: Consider in-vac cabling. == Other items == * Oplev: * ACC: * Commissioning: * Vacuum system: The IFI-PRM chamber was evacuated on 3/6. * Heater control: * TMS: Covering was completed. == Discussion == ---------- = VIS Meeting = Date: 2023/3/10 13:30-13:40 Participants: Takahashi, Ushiba, Fabian, Tanaka, Aso == Summary Report == === Type-A === === Type-B === * BS IP: New sensor correction and blending filters were designed by Terrence. Today I'm writing them in the filter banks. === Type-Bp ===  * Monitored the PRM suspension during the evacuation. === Type-C === * We should check the effects due to the in-vac cables. === Electronics === === Control === == Schedule == * Type-A: IP control with ACCs. * Type-B/Bp: BS sensor correction and blending. * Type-C: == Safety == == Discussion == == Travel Plans == (Date in Kamioka) The week from 3/13 * Aso: 3/13-16 * Sato: 3/15-16 The week from 3/20 == Next meeting == * 2023/3/17(FRI) 13:30-