Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2023/3/17 13:00-
Participants:
Status
- Type-A: Centering of the IP with the FR in EY.
- Type-B: Sensor correction in BS.
- Type-Bp:
- Type-C:
Other items
- Oplev:
- ACC:
- Commissioning:
- Vacuum system: Activated some SIPs.
- Heater control:
- TMS:
Discussion
VIS Meeting
Date: 2023/3/17 13:30-
Participants:
Summary Report
Type-A
- Centered the IP with the FR in EY.
Type-B
Type-Bp
Type-C
Electronics
Control
Schedule
- Type-A: IP control with ACCs.
- Type-B/Bp: BS sensor correction and blending.
- Type-C:
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 3/20
- Takahashi: 3/23-24
- Mitsuhashi: 3/23-24
Next meeting
- 2023/3/24(FRI) 13:30-