Differences between revisions 1 and 2
Revision 1 as of 2023-03-16 16:15:58
Size: 1076
Comment:
Revision 2 as of 2023-03-17 09:40:51
Size: 1155
Comment:
Deletions are marked like this. Additions are marked like this.
Line 15: Line 15:
 * Type-A:  * Type-A: Centering of the IP with the FR in EY.
Line 38: Line 38:
 * Centered the IP with the FR in EY.

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2023/3/17 13:00-

Participants:

Acceptance check document

Status

  • Type-A: Centering of the IP with the FR in EY.
  • Type-B: Sensor correction in BS.
  • Type-Bp:
  • Type-C:

Other items

  • Oplev:
  • ACC:
  • Commissioning:
  • Vacuum system: Activated some SIPs.
  • Heater control:
  • TMS:

Discussion


VIS Meeting

Date: 2023/3/17 13:30-

Participants:

Summary Report

Type-A

  • Centered the IP with the FR in EY.

Type-B

Type-Bp

Type-C

Electronics

Control

Schedule

  • Type-A: IP control with ACCs.
  • Type-B/Bp: BS sensor correction and blending.
  • Type-C:

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 3/20

  • Takahashi: 3/23-24
  • Mitsuhashi: 3/23-24

Next meeting

  • 2023/3/24(FRI) 13:30-

KAGRA/Subgroups/VIS/VISMinutes20230317 (last edited 2023-03-17 13:39:50 by RyutaroTakahashi)