Size: 1076
Comment:
|
← Revision 4 as of 2023-03-17 13:39:50 ⇥
Size: 1351
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 8: | Line 8: |
Date: 2023/3/17 13:00- | Date: 2023/3/17 13:00-13:06 |
Line 10: | Line 10: |
Participants: | Participants: Takahashi, Uchiyama, Mitsuhashi, Ikeda, Sato, Tomaru, Ushiba, Akutsu, Hirata, Yokozawa, Ushiba, Aso |
Line 15: | Line 15: |
* Type-A: | * Type-A: Centering of the IP with the FR in EY. |
Line 21: | Line 21: |
* Oplev: | * Oplev: Planing the noise budget. |
Line 32: | Line 32: |
Date: 2023/3/17 13:30- | Date: 2023/3/17 13:30-13:36 |
Line 34: | Line 34: |
Participants: | Participants: Takahashi, Fabian, Tanaka, Aso |
Line 38: | Line 38: |
* Centered the IP with the FR in EY. |
|
Line 39: | Line 41: |
* Sensor correction in BS. |
Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2023/3/17 13:00-13:06
Participants: Takahashi, Uchiyama, Mitsuhashi, Ikeda, Sato, Tomaru, Ushiba, Akutsu, Hirata, Yokozawa, Ushiba, Aso
Status
- Type-A: Centering of the IP with the FR in EY.
- Type-B: Sensor correction in BS.
- Type-Bp:
- Type-C:
Other items
- Oplev: Planing the noise budget.
- ACC:
- Commissioning:
- Vacuum system: Activated some SIPs.
- Heater control:
- TMS:
Discussion
VIS Meeting
Date: 2023/3/17 13:30-13:36
Participants: Takahashi, Fabian, Tanaka, Aso
Summary Report
Type-A
- Centered the IP with the FR in EY.
Type-B
- Sensor correction in BS.
Type-Bp
Type-C
Electronics
Control
Schedule
- Type-A: IP control with ACCs.
- Type-B/Bp: BS sensor correction and blending.
- Type-C:
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 3/20
- Takahashi: 3/23-24
- Mitsuhashi: 3/23-24
Next meeting
- 2023/3/24(FRI) 13:30-