Differences between revisions 2 and 3
Revision 2 as of 2023-03-17 09:40:51
Size: 1155
Comment:
Revision 3 as of 2023-03-17 13:09:22
Size: 1284
Comment:
Deletions are marked like this. Additions are marked like this.
Line 8: Line 8:
Date: 2023/3/17 13:00- Date: 2023/3/17 13:00-13:06
Line 10: Line 10:
Participants: Participants: Takahashi, Uchiyama, Mitsuhashi, Ikeda, Sato, Tomaru, Ushiba, Akutsu, Hirata, Yokozawa, Ushiba, Aso
Line 21: Line 21:
 * Oplev:  * Oplev: Planing the noise budget.

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2023/3/17 13:00-13:06

Participants: Takahashi, Uchiyama, Mitsuhashi, Ikeda, Sato, Tomaru, Ushiba, Akutsu, Hirata, Yokozawa, Ushiba, Aso

Acceptance check document

Status

  • Type-A: Centering of the IP with the FR in EY.
  • Type-B: Sensor correction in BS.
  • Type-Bp:
  • Type-C:

Other items

  • Oplev: Planing the noise budget.
  • ACC:
  • Commissioning:
  • Vacuum system: Activated some SIPs.
  • Heater control:
  • TMS:

Discussion


VIS Meeting

Date: 2023/3/17 13:30-

Participants:

Summary Report

Type-A

  • Centered the IP with the FR in EY.

Type-B

Type-Bp

Type-C

Electronics

Control

Schedule

  • Type-A: IP control with ACCs.
  • Type-B/Bp: BS sensor correction and blending.
  • Type-C:

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 3/20

  • Takahashi: 3/23-24
  • Mitsuhashi: 3/23-24

Next meeting

  • 2023/3/24(FRI) 13:30-

KAGRA/Subgroups/VIS/VISMinutes20230317 (last edited 2023-03-17 13:39:50 by RyutaroTakahashi)