Differences between revisions 1 and 2
Revision 1 as of 2023-03-30 16:47:22
Size: 1152
Comment:
Revision 2 as of 2023-03-31 12:49:37
Size: 1161
Comment:
Deletions are marked like this. Additions are marked like this.
Line 26: Line 26:
 * TMS:  * TMS: GV in EXT

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2023/3/31 13:00-

Participants:

Acceptance check document

Status

  • Type-A:
  • Type-B:
  • Type-Bp:
  • Type-C:

Other items

  • Oplev:
  • ACC: Design of the blending filter with ACCs.
  • Commissioning:
  • Vacuum system: Activation of the SIPs.
  • Heater control:
  • TMS: GV in EXT

Discussion


VIS Meeting

Date: 2023/3/31 13:30-

Participants:

Summary Report

Type-A

  • Investigated the performance of the sensor correction.
  • Designing the blending filter with ACCs.

Type-B

Type-Bp

Type-C

Electronics

Control

Schedule

  • Type-A: IP control with ACCs.
  • Type-B/Bp:
  • Type-C:

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 4/3

  • Fabian: 3/27-4/18 (vacation)

Next meeting

  • 2023/4/7(FRI) 13:30-

KAGRA/Subgroups/VIS/VISMinutes20230331 (last edited 2023-03-31 13:43:37 by RyutaroTakahashi)