Size: 1161
Comment:
|
Size: 1309
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 8: | Line 8: |
Date: 2023/3/31 13:00- | Date: 2023/3/31 13:00-13:15 |
Line 10: | Line 10: |
Participants: | Participants: Takahashi, Yokozawa, Aso, Ikeda, Uchiyama, Sato, Hirata, Akutsu, Ushiba |
Line 15: | Line 15: |
* Type-A: | * Type-A: Replacement of the coil drivers with glitches. |
Line 21: | Line 21: |
* Oplev: | * Oplev: Investigation of glitches. |
Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2023/3/31 13:00-13:15
Participants: Takahashi, Yokozawa, Aso, Ikeda, Uchiyama, Sato, Hirata, Akutsu, Ushiba
Status
- Type-A: Replacement of the coil drivers with glitches.
- Type-B:
- Type-Bp:
- Type-C:
Other items
- Oplev: Investigation of glitches.
- ACC: Design of the blending filter with ACCs.
- Commissioning:
- Vacuum system: Activation of the SIPs.
- Heater control:
- TMS: GV in EXT
Discussion
VIS Meeting
Date: 2023/3/31 13:30-
Participants:
Summary Report
Type-A
- Investigated the performance of the sensor correction.
- Designing the blending filter with ACCs.
Type-B
Type-Bp
Type-C
Electronics
Control
Schedule
- Type-A: IP control with ACCs.
- Type-B/Bp:
- Type-C:
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 4/3
- Fabian: 3/27-4/18 (vacation)
Next meeting
- 2023/4/7(FRI) 13:30-