Differences between revisions 3 and 4
Revision 3 as of 2023-03-31 13:17:58
Size: 1309
Comment:
Revision 4 as of 2023-03-31 13:43:37
Size: 1354
Comment:
Deletions are marked like this. Additions are marked like this.
Line 8: Line 8:
Date: 2023/3/31 13:00-13:15 Date: 2023/3/31 13:00-13:13
Line 32: Line 32:
Date: 2023/3/31 13:30- Date: 2023/3/31 13:30-13:42
Line 34: Line 34:
Participants: Participants: Takahashi, Uchiyama, Ushiba, Tanaka, Aso

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2023/3/31 13:00-13:13

Participants: Takahashi, Yokozawa, Aso, Ikeda, Uchiyama, Sato, Hirata, Akutsu, Ushiba

Acceptance check document

Status

  • Type-A: Replacement of the coil drivers with glitches.
  • Type-B:
  • Type-Bp:
  • Type-C:

Other items

  • Oplev: Investigation of glitches.
  • ACC: Design of the blending filter with ACCs.
  • Commissioning:
  • Vacuum system: Activation of the SIPs.
  • Heater control:
  • TMS: GV in EXT

Discussion


VIS Meeting

Date: 2023/3/31 13:30-13:42

Participants: Takahashi, Uchiyama, Ushiba, Tanaka, Aso

Summary Report

Type-A

  • Investigated the performance of the sensor correction.
  • Designing the blending filter with ACCs.

Type-B

Type-Bp

Type-C

Electronics

Control

Schedule

  • Type-A: IP control with ACCs.
  • Type-B/Bp:
  • Type-C:

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 4/3

  • Fabian: 3/27-4/18 (vacation)

Next meeting

  • 2023/4/7(FRI) 13:30-

KAGRA/Subgroups/VIS/VISMinutes20230331 (last edited 2023-03-31 13:43:37 by RyutaroTakahashi)