Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2023/4/14 13:00-
Participants:
Status
- Type-A:
- Type-B:
- Type-Bp: Optimization of the damping control of GAS filters.
- Type-C: Offload in IMMT1 and IMMT2.
Other items
- Oplev: Investigation of the glitches in SR2.
- ACC: Replacement of the coil driver in EX.
- Commissioning: Measurements of DAC noise for ITMX and ITMY.
- Vacuum system: 6 TMPs stop.
- Heater control: Adjustment in IY.
- TMS:
Discussion
VIS Meeting
Date: 2023/4/14 13:30-
Participants:
Summary Report
Type-A
Type-B
Type-Bp
Type-C
Electronics
Control
R&D
Schedule
- Type-A:
- Type-B/Bp: Damping control of GAS filters.
- Type-C:
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 4/17
- Fabian: 3/27-4/18 (vacation)
Next meeting