Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2023/4/14 13:00-

Participants:

Acceptance check document

Status

  • Type-A:
  • Type-B:
  • Type-Bp: Optimization of the damping control for the BF damper.
  • Type-C: Offload in IMMT1 and IMMT2.

Other items

  • Oplev: Investigation of the glitches in SR2.
  • ACC: Replacement of the coil driver in EX.
  • Commissioning: Measurements of DAC noise for ITMX and ITMY.
  • Vacuum system: 6 TMPs stop.
  • Heater control: Adjustment in IY.
  • TMS:

Discussion


VIS Meeting

Date: 2023/4/14 13:30-

Participants:

Summary Report

Type-A

Type-B

Type-Bp

Type-C

Electronics

Control

R&D

Schedule

  • Type-A:
  • Type-B/Bp: Damping control of GAS filters.
  • Type-C:

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 4/17

  • Fabian: 3/27-4/18 (vacation)

Next meeting

  • 2023/4/21(FRI) 13:30-