Size: 1133
Comment:
|
← Revision 8 as of 2023-04-28 13:46:00 ⇥
Size: 1644
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 8: | Line 8: |
Date: 2023/4/28 13:00- | Date: 2023/4/28 13:00-13:10 |
Line 10: | Line 10: |
Participants: | Participants: Takahashi, Mitsuhashi, Yokozawa, Akutsu, Tomaru, Ushiba, Uchiyama, Miyoki |
Line 15: | Line 15: |
* Type-A: | * Type-A: Investigation of the Oplev glitches in EY. |
Line 21: | Line 21: |
* Oplev: | * Oplev: QPD centering will be necessary. |
Line 23: | Line 23: |
* Commissioning: Measurements of DAC noise. | * Commissioning: Measurements of DAC noise in BS/PR2. |
Line 32: | Line 32: |
Date: 2023/4/28 13:30- | Date: 2023/4/28 13:30-13:40 |
Line 34: | Line 34: |
Participants: | Participants: Takahashi, Mitsuhashi, Ushiba, Fabian, Tanaka |
Line 39: | Line 39: |
* Measured the noise of the LVDTs and geophones in SR2. * Measured the DAC noises in BS/PR2. |
|
Line 40: | Line 43: |
* Measured the spectra and TFs of the PR2 suspension. Comparing the TFs with the mechanical models. |
|
Line 44: | Line 49: |
* Measured the TF and Q of the R.L. prototype. | |
Line 59: | Line 65: |
* (Golden week) | * Sato: 5/3-4 (Safety shift) * Hirata: 5/6-8 (Safety shift) |
Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2023/4/28 13:00-13:10
Participants: Takahashi, Mitsuhashi, Yokozawa, Akutsu, Tomaru, Ushiba, Uchiyama, Miyoki
Suspensions
- Type-A: Investigation of the Oplev glitches in EY.
- Type-B: Measurements on the sensor correction in SR2.
- Type-Bp: Optimization of the damping control.
- Type-C:
Other items
- Oplev: QPD centering will be necessary.
- ACC:
- Commissioning: Measurements of DAC noise in BS/PR2.
- Vacuum system:
- Heater control:
- TMS:
Discussion
VIS Meeting
Date: 2023/4/28 13:30-13:40
Participants: Takahashi, Mitsuhashi, Ushiba, Fabian, Tanaka
Summary Report
Type-A
Type-B
- Measured the noise of the LVDTs and geophones in SR2.
- Measured the DAC noises in BS/PR2.
Type-Bp
- Measured the spectra and TFs of the PR2 suspension. Comparing the TFs with the mechanical models.
Type-C
Electronics
Control
R&D
- Measured the TF and Q of the R.L. prototype.
Schedule
- Type-A:
- Type-B: Measurements in SRs.
- Type-Bp: Damping control for BF damper.
- Type-C:
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 5/1
- Sato: 5/3-4 (Safety shift)
- Hirata: 5/6-8 (Safety shift)
Next meeting
- 2023/5/12(FRI) 13:30-